Permit NumberFIR09-00741
StatusFinaled
Name POWER PLUS INC
Site Address 12376 W EXECUTIVE DR
Project NameOregon Tile and Marble -Shell
Customer Number 
ePlanReview 
Description
1/22/10 PLAN MODIFICATION
This plan modification is to include the monitoring for three duct detectors.

This fire alarm permit is to provide sprinkler monitoring for a new shell building. Included in this permit scope is sprinkler monitoring, a pull station, a voluntary smoke detector above the panel, and a voluntary weatherproof horn/strobe on the exterior of the riser room. HVAC has not been shown on the plans, therefore duct detectors are not part of this permit scope.

Associated building permit: BLD09-01024 Oregon Tile and Marble (Shell Only) - To construct a new 28,670 square foot, one story, retail, business and storage shell building and related site improvements. This building is constructed of concrete tilt-up exterior walls and steel structural roof and interior structural supports. The shell will include the construction of a fire riser room and mechanical room. This building is fully fire sprinkled. The sprinklers are used for area increase and S-1 Occupancy fire area. This is shell permit only and no occupancy is allowed under this permit. A separate tenant improvement permit is required to finish this building for occupancy. The plumbing, mechanical and electrical work shown on the approved plans are part of the shell construction. All construction per the approved plans and attached comment list. JCM
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection2/8/20102/8/20102/8/2010PPASS
DetailsTroy Cobbley
Permit finaled. The monitoring signals had to be modified while I was on site.
INSP-Final Inspection2/5/20102/5/20102/5/2010PFAIL
DetailsTroy Cobbley
After testing all of the devices the monitoring station was contacted and they stated that the account was set up as test only which ment the signals were not correct, building address and call list had not been set up yet. The testing will need to be redone and the signals reverified. All of the devices reported correctly to the fire alarm panel. All three of the duct smoke detectors had been installed backwards and were correctly installed and tested as I waited.
INSP-Conference1/7/20101/7/20101/7/2010ADONE
DetailsTroy Cobbley
While onsite performing job related fire sprinkler inspection, noticed the fire alarm vendor had completed installation of fire alarm system without approved plans. Plans are currently under review in the PDS office. NOTE to plans examiner: Work completed without permit.