Information based on query as of Wednesday, August 14, 2024.
Permit Information
Permit NumberFIR10-00018
StatusFinaled
Name AMERICAN FIRE PROTECTION LLC
Site Address 130 N MILWAUKEE ST
Project NamePETSMART
Customer Number 
ePlanReview 
Description
The Fire Sprinkler Scope of work consists of protecting a new building with a modified 4"x3"x1½" grid system. The underground supply is existing 6" DI. A new 8" riser with an 8" backflow preventer will be installed with a wall PIV. There is also a high piled storage area supplied from the feed main of the grid. The high pile storage is 18' high, 8' aisles and class IV commodity. The storage is pet food, in paper bags on conventional wood pallets. EC25 sprinklers with a maximum of 196 sf spacing (14'maximum, 10'minimum) have been utilized to protect the high pile storage. There will be no plastic storage or packaging in the high pile storage area. The sales area has been designed for Ordinary Hazard II consequently, a maximum of 12' storage is permitted. The canopy does not have fire protection; therefore, storage or handling of combustibles below the canopy is not permitted. This would include 'Sidewalk Sales"

(PETSMART TENANT IMPROVEMENT) This building is required to be fire sprinklered for building area increase. To construct interior tenant improvements within a new building shell for a pet store. This tenant space will be used for retail sales, pet salon, pet medical treatment, and pet boarding. The building shell was constructed under permit BLD09-01007. Work is to include interior nonbearing walls, interior doors, interior windows, 2 restrooms accessible to the disabled, suspended acoustical ceilings, millwork, and finishes. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes and ordinances. The fire sprinkler system is required to comply with NFPA 13 as regulated by the Fire Department. A separate permit is required for high-rack storage. **CJW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection4/28/20104/29/20104/29/2010PPASS
DetailsTroy Cobbley
Permit finaled
INSP-Final Inspection4/22/20104/23/20104/23/2010AFAIL
DetailsTroy Cobbley
The forward flush of the backflow passed. This permit can be finaled when the interconnections with the fire alarm system have been verified. Ken to provide copies of the test papers at the next inspection.
INSP-Sprinkler Rough-in/Hydro4/8/20104/9/20104/9/2010APASS
DetailsTroy Cobbley
The overhead hydro test passed.
INSP-Sprinkler Rough-in/Hydro4/7/20104/8/20104/8/2010AFAIL
DetailsTroy Cobbley
Overhead hydro test failed due to pressure drop and visable leak.
INSP-Sprinkler Rough-in3/31/20104/1/20104/1/2010APASS
DetailsTroy Cobbley
The piping above the layin tile in the west end of the building can be covered.
INSP-Sprinkler Rough-in/Hydro3/29/20103/29/20103/29/2010PPASS
DetailsTroy Cobbley
Sprinkler rough-in passed. The office areas on the south side of the building are ok for ceiling installation by this inspector. The office areas on the west end are not finished. I noted many heads that are still covered with tin foil to protect from painting. Resubmittals are required due to piping changes as marked in red on the city approved plans (riser nipples in the storage remote area are the biggest issue).
INSP-Final Inspection3/29/20103/29/20103/29/2010PFAIL
DetailsTroy Cobbley
Project is not ready for a final inspection. A rough-in inspection has been set up.