INSP-Final Inspection | 1/13/2011 | 1/14/2011 | 1/14/2011 | A | PASS |
Troy Cobbley
|
|
|
permit finaled.
|
INSP-Final Inspection | 1/13/2011 | 1/13/2011 | 1/13/2011 | P | CANC |
Troy Cobbley
|
|
|
Canceled due to time constraints and Micron plan review
|
FIR-Aging Inspection | 1/3/2011 | 1/3/2011 | 1/10/2011 | | NR |
Troy Cobbley
|
|
|
work is in progress
|
INSP-Sprinkler Rough-in | 11/2/2010 | 11/3/2010 | 11/3/2010 | P | PASS |
Troy Cobbley
|
|
|
The 24 hour air test passed
|
INSP-Sprinkler Rough-in | 11/1/2010 | 11/2/2010 | 11/2/2010 | A | PASS |
Troy Cobbley
|
|
|
24 hr air test inspection started at 9:30 am with 46psi on the guage.
|
INSP-Sprinkler Rough-in/Hydro | 11/1/2010 | 11/1/2010 | 11/1/2010 | P | PASS |
Troy Cobbley
|
|
|
Overhead hydro test passed
|
INSP-Sprinkler Rough-in | 8/25/2010 | 8/25/2010 | 8/25/2010 | P | PASS |
Troy Cobbley
|
|
|
Above ground hydro test passed.
|
INSP-Sprinkler Rough-in/Hydro | 8/24/2010 | 8/25/2010 | 8/25/2010 | A | FAIL |
Troy Cobbley
|
|
|
Above ground hydro test failed. Earthquaking has been corrected and the FDC piping has been installed. Phone #: ###-####
|
INSP-Sprinkler Rough-in | 8/6/2010 | 8/6/2010 | 8/6/2010 | P | PASS |
Troy Cobbley
|
|
|
The rough-in inspection passed except for the earthquake bracing and the rerouted fire dept connection piping.
|