INSP-Final Inspection | 3/29/2010 | 3/29/2010 | 3/29/2010 | P | PASS |
Forrest France
|
|
|
C/N items finished, fire sprinkler permit final approved.
|
INSP-Sprinkler Rough-in | 3/25/2010 | 3/25/2010 | 3/25/2010 | P | PART |
Forrest France
|
|
|
Ref. NFPA 13 sec. 8.16.4.2.3 regarding inspection activity notes.
|
INSP-Final Inspection | 3/24/2010 | 3/24/2010 | 3/24/2010 | P | PART |
Forrest France
|
|
|
Final pending protection of piping from corrosion where exposed at the outside of the building per NFPA 13 ch. 8 as discussed, also need to provide spare sprinkler stock of the new type installed at the head box. Remainder of overhead modifications and rough-in per the scope of work are satisfactory.
|
INSP-Final Inspection | 3/23/2010 | 3/23/2010 | 3/23/2010 | P | CANC |
Forrest France
|
|
|
Jim Phone #: ###-#### Inspection to be rescheduled per conversation with contractor.
|