INSP-Final Inspection | 10/25/2010 | 10/27/2010 | 10/28/2010 | A | PASS |
Forrest France
|
|
|
fire sprinkler permit final approved.
|
INSP-Final Inspection | 10/21/2010 | 10/22/2010 | 10/22/2010 | A | CANC |
Troy Cobbley
|
|
|
Jeff and I spoke and agreed the inspection would be canceled due to the project related fire alarm drawings not being issued yet. Without approved drawings the interconnections will not be tested. Inspection to be rescheduled.
|
INSP-Alarm Testing | 10/21/2010 | 10/22/2010 | 10/22/2010 | A | CANC |
Troy Cobbley
|
|
|
Jeff and I spoke and agreed the inspection would be canceled due to the project related fire alarm drawings not being issued yet. Without approved drawings the interconnections will not be tested. Inspection to be rescheduled.
|
INSP-Final Inspection | 10/19/2010 | 10/20/2010 | 10/20/2010 | P | DEFR |
Forrest France
|
|
|
Not ready for final per contractor.
|
INSP-Sprinkler Rough-in/Hydro | 8/25/2010 | 8/25/2010 | 8/26/2010 | P | PART |
Forrest France
|
|
|
Concluded satisfactory pneumatic test of the new preaction system with no pressure loss at the guage.
|
INSP-Sprinkler Rough-in/Hydro | 8/24/2010 | 8/24/2010 | 8/24/2010 | P | PART |
Forrest France
|
|
|
Hydrostatic test of the overhead wet system passed. Begin 24 hour pneumatic test of the new preaction system @ 11:45 AM 42psig.
|
INSP-Sprinkler Rough-in/Hydro | 8/23/2010 | 8/23/2010 | 8/23/2010 | P | PART |
Forrest France
|
|
|
Overhead work at the grid ceilings is approved for cover. Hydrostatic test of the new preaction system passed. Wet system hydro incomplete.
|
INSP-Sprinkler Rough-in/Hydro | 7/29/2010 | 7/29/2010 | 7/29/2010 | A | PART |
Forrest France
|
|
|
Okayed for cover at areas per activity notes and annotations on the stamped plans.
|
INSP-Sprinkler Rough-in | 7/15/2010 | 7/15/2010 | 7/15/2010 | P | PART |
Forrest France
|
|
|
Okayed overhead modification at the janitors room and the preaction system tie-in above the sheetrock lid.
|
INSP-Sprinkler Rough-in | 7/13/2010 | 7/13/2010 | 7/13/2010 | P | PART |
Forrest France
|
|
|
Overhead fire sprinkler work is approved for cover at the sheetrock ceilings.
|
INSP-Sprinkler Rough-in | 6/14/2010 | 6/15/2010 | 6/15/2010 | A | PART |
Forrest France
|
|
|
Okay to cover FDC piping at wall and one closet at the north side.
|
INSP-Sprinkler Rough-in | 5/26/2010 | 5/26/2010 | 5/27/2010 | P | PART |
Forrest France
|
|
|
Overhead install is approved for cover at four rooms as marked on stamped plan set with today's date. Some areas not yet finished including the FDC, riser, preaction riser, heads in drop ceilings, etc. Preliminary rough-in inspection at this time only.
|
INSP-Sprinkler Rough-in | 3/2/2010 | 3/2/2010 | 3/2/2010 | P | PART |
Forrest France
|
|
|
Underground fire supply line and stub-in including the ductile riser, two thrust blocks and two lengths of C-900 outside the new building as marked on approved plans are okay for bury.
|