INSP-Final Inspection | 3/29/2011 | 3/30/2011 | 3/30/2011 | A | PASS |
Troy Cobbley
|
|
|
permit finaled
|
FIR-Aging Inspection | 3/29/2011 | 3/29/2011 | 3/30/2011 | | PASS |
Troy Cobbley
|
|
|
|
INSP-Final Inspection | 1/27/2011 | 1/27/2011 | 1/27/2011 | P | PART |
Tim Frost
|
|
|
This inspection was called in under the wrong permit BLD10-00114.
The exterior canopy was inspected. The canopy is completely filled with non-combustible insulation. I gave then the ok to cover the canopy with hardy board. Therefore no sprinkler was required.
|
INSP-Final Inspection | 12/8/2010 | 12/8/2010 | 12/8/2010 | P | PART |
Troy Cobbley
|
|
|
A temporary occupancy was given, with Scott's permission, until the front entry canopy is complete and the additional fire sprinkler is installed.
|
INSP-Final Inspection | 12/2/2010 | 12/3/2010 | 12/3/2010 | A | FAIL |
Troy Cobbley
|
|
|
Need to perform a job walk through and verify there are no head obstructions, need all of the final items at the riser such as backflow certification, head box, stickers...ect. Also noted that a pendant head was installed in the electrical room but a ceiling had not been installed.
|
INSP-Supply line flush | 12/2/2010 | 12/3/2010 | 12/3/2010 | A | PASS |
Troy Cobbley
|
|
|
supply line flush passed.
|
INSP-Sprinkler Rough-in | 12/2/2010 | 12/3/2010 | 12/3/2010 | A | PASS |
Troy Cobbley
|
|
|
The underground flush passed and the forward flush test of the backflow preventor passed.
|
INSP-Sprinkler Rough-in/Hydro | 12/2/2010 | 12/2/2010 | 12/2/2010 | P | PASS |
Troy Cobbley
|
|
|
The overhead hydro passed.
|
INSP-Sprinkler Rough-in/Hydro | 10/19/2010 | 10/20/2010 | 10/20/2010 | A | PASS |
Troy Cobbley
|
|
|
The under ground hydro passed. No flush was performed.
|
INSP-Sprinkler Rough-in | 10/14/2010 | 10/15/2010 | 10/15/2010 | A | PASS |
Troy Cobbley
|
|
|
The underground supply piping is ok to cover.
|
INSP-Sprinkler Rough-in | 8/25/2010 | 8/25/2010 | 8/25/2010 | P | PASS |
Troy Cobbley
|
|
|
The sprinkler piping in the high ceiling area, as discussed, can be covered.
|
INSP-Sprinkler Rough-in/Hydro | 8/19/2010 | 8/19/2010 | 8/19/2010 | P | PASS |
Troy Cobbley
|
|
|
Piping rough-in passed except for the two clouded areas marked on the plan in red where the piping has not been installed yet. Also one upright head is blocked by truss web members and is to be relocated as discussed. As-built plans will be required showing the piping routing changes. A hydro test was not performed since the upright needs relocated and none of the permanant sprinkler pendants/sidewalls have been installed. Branch line restraints have not been installed and the longitudinal earthquake bracing has not been installed. The insulation will be required to be installed at the deck since the upright sprinkler heads are located too far below the wood deck.
|
FIR-Aging Inspection | 7/9/2010 | 7/9/2010 | 7/9/2010 | | NR |
Troy Cobbley
|
|
|
Work is in progress
|