Permit Information
Permit NumberFIR10-00073
StatusFinaled
Name SIMPLEX GRINNELL
Site Address 1055 N CURTIS RD
Project NameSARMC CLINICAL LAB RENOVATION
Customer Number 
ePlanReview 
Description
1/4/11: PLAN MODIFICATION (no initiating devices affected). This plan modification is to relocate and add notification to accommodate lab stations obstructing the effects of the devices.

2/26/10: This fire alarm permit is to provide smoke detectors, in-duct detectors, duct detectors, door holder connections, and chime/strobes to accommodate a tenant remodel. A new NAC panel is included in this permit scope to accommodate the new chime/strobes.

Associated building permit: BLD09-02069 (ST ALPHONSUS - CLINICAL LABORATORY RENOVATION) Renovation of existing Clinical Laboratory Department to accommodate the installation of an automatic testing line and relocation of the Histology and Cytology Departments. Work will include selective interior demolition in five different phases in conjunction with five phases of tenant remodel to allow Lab functions to continue. In order to maintain operation requirements of the Lab some existing rooms in the immediate Lab Clinic area will receive minimum modifications to facility maintaining use of equipment and work stations for lab activities while their portion of the clinic is demolished and remodeled. At the conclusion of the remodel all activities and support functions will be within the existing Clinical Lab and expanded Histology and Cytology Departments in the SE corner of the 1st floor of SARMC. Work includes construction of new non-bearing walls to create work / testing areas, relocation of existing walk-in cooler; relocation / construction of existing 2-hour fire barrier wall on west and north sides of new Cytology Dept.; structural modification for new door opening in concrete wall between Histology 101 & Cytology 103 (see 8-1/2" xx 11" structural design and details); and upgrades of electrical, mechanical, plumbing, sprinkler and alarm systems to meet tenant needs and provide / maintain code compliance. Drs
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection1/28/20112/1/20112/1/2011APASS
DetailsTroy Cobbley
Permit finaled
INSP-Final Inspection12/15/201012/16/201012/16/2010AFAIL
DetailsTroy Cobbley
The plans need to be re-submitted for plan modifications, as per the red note by the plan reviewer, since the partitions/shelves exceed 6'-0" in height. I went ahead and tested the smoke detectors which passed inspection.
FIR-Aging Inspection11/25/201011/25/201012/2/2010 NR
DetailsTroy Cobbley
work is in progress
INSP-Sprinkler Rough-in5/14/20105/18/20105/18/2010APASS
DetailsTroy Cobbley
The fire alarm in phase two passed inspection
INSP-Final Inspection4/8/20104/8/20104/8/2010PPART
DetailsTroy Cobbley
The phase 1 fire alarm testing is passed.
INSP-Sprinkler Rough-in4/6/20104/7/20104/7/2010AFAIL
DetailsTroy Cobbley
This inspectio was for phase 1. All items tested ok except for the duct detector located in the main existing exit corridor did not shut down the hvac unit when activated.