Information based on query as of Friday, August 16, 2024.
Permit Information
Permit NumberFIR10-00089
StatusFinaled
Name DELTA FIRE SYSTEMS
Site Address 1175 W LAKE HAZEL RD
Project NameOld Dominion Freight Lines
Customer Number 
ePlanReview 
Description
The Fire Sprinkler Scope of work consists of two systems, one dry loop protecting the dock and one wet tree system protection the office/sales area. The systems are supplied by approximately 160'± of 6" C-900 underground piping through a 4" backflow preventer and header. The dry system is designed to use galvanized piping.

Old Dominion Freight Lines - To construct a new 20,075 square foot, one story office and warehouse building and related site improvements. This building will be constructed on tilt-up concrete exterior walls and a pre-engineered metal building interior and roof structure. The warehouse will have a ten foot metal overhang over the loading dock areas. This building will be fully fire sprinkled. Office 3,700 square feet; Warehouse 16,375 square feet. All construction per the approved plans and attached comment list. JCM
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection7/30/20108/2/20108/3/2010PPASS
DetailsForrest France
Corrections verified, final walkthrough and acceptance testing passed. Permit finaled.
INSP-Sprinkler Rough-in7/13/20107/13/20107/13/2010APART
DetailsForrest France
Ref. inspection notes and correction list 6/30.
INSP-Sprinkler Rough-in/Hydro7/1/20107/2/20107/2/2010PPART
DetailsForrest France
Concluded satisfactory 24hr. air test for the new dry system per NFPA 13.
INSP-Sprinkler Rough-in/Hydro7/1/20107/1/20107/1/2010PPART
DetailsForrest France
Begin 24 hour pneumatic test for the new dry system at 1:00PM @ 42psig.
INSP-Sprinkler Rough-in6/30/20106/30/20106/30/2010PFAIL
DetailsForrest France
Missing one lateral seismic brace at the south end of the dry system main, shadowing at one office area, welded 2" outlets on the dry system mains serving branchlines at the exterior canopy at some locations are not properly graded, noted one dry pendent at the main entry has been added. See stamped plans for annotations.
INSP-Sprinkler Rough-in/Hydro6/29/20106/30/20106/30/2010APART
DetailsForrest France
Overhead hydrostatic test for both the wet and dry systems completed satisfactory.
INSP-Sprinkler Rough-in/Hydro6/28/20106/28/20106/28/2010PDEFR
DetailsForrest France
john Phone #: ###-####