Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberFIR10-00124
StatusFinaled
Name TRI STATE ELECTRIC
Site Address 618 N ALLUMBAUGH ST
Project NameDarigold
Customer Number 
ePlanReview 
Description
4-23-10 PLAN MODIFICATION: This plan modification to the quick permit is to include a smoke detector and a horn only due to field changes. 4-6-10: This quick permit is to provide an induct detector for a new f/s damper, a PIV, and tamper switches. They will be connected to the existing fire alarm panel using spare zones #3, #4, & #15. No written comments. Associated building permit: BLD09-02232 Darigold - Chemical Storage Room Addition - To make the exising 400 square foot, dock on the north side of the building permanent and to construct a 600 square foot, one story chemical storage room on the west side of the dock. The storage room and dock addition are constructed of masonry and steel stud exterior walls and steel roof joists with metal roofing over plywood roof deck. This permit also includes the construction of a secondary containment area around the "courtyard" on the interior of the building surround. All construction per the approved plans and red lined notes. JCM
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection4/26/20104/26/20104/26/2010PPASS
DetailsForrest France
Fire alarm permit finaled.
INSP-Final Inspection4/23/20104/26/20104/26/2010APASS
DetailsForrest France
C/N items field verified for completion, final inspection passed.
INSP-Conference4/23/20104/23/20104/26/2010ADONE
DetailsForrest France
Re permit status
INSP-Alarm Testing4/19/20104/19/20104/19/2010PPART
DetailsForrest France
New devices passed functional testing including the ID detector, antifreeze system tamper switches, OS&Y tampers at the double check, wet system flow switch and PIV tamper. Also tested the new area smoke detector and horn at the chemical storage room. Items needed for final include approved resubmittals showing the additional SD and horn at the chem. room, NFPA 72 record of completion report, legible labels at FACP for zone descriptors, repair the trouble conditon on the existing notification circut at the panel.