INSP-Final Inspection | 12/21/2010 | 12/21/2010 | 12/21/2010 | P | PASS |
Forrest France
|
|
|
Corrections verified, fire alarm permit finaled.
|
INSP-Final Inspection | 12/16/2010 | 12/16/2010 | 12/17/2010 | P | NH |
Forrest France
|
|
|
|
INSP-Final Inspection | 12/15/2010 | 12/16/2010 | 12/16/2010 | A | FAIL |
Forrest France
|
|
|
Still need revised account information- supervisory signals were not recieved by central station monitoring.
|
INSP-Final Inspection | 12/13/2010 | 12/13/2010 | 12/14/2010 | P | CANC |
Forrest France
|
|
|
Insufficient netcon rating.
|
INSP-Final Inspection | 11/8/2010 | 11/9/2010 | 11/9/2010 | A | FAIL |
Forrest France
|
|
|
Account information at central station needs revised to match signals sent. All points reported as "3rd floor RTU".
|
INSP-Final Inspection | 11/8/2010 | 11/8/2010 | 11/8/2010 | P | PART |
Forrest France
|
|
|
NAC circut testing scheduled 11/9, supervisory signals okay.
|
INSP-Final Inspection | 11/5/2010 | 11/5/2010 | 11/5/2010 | P | NR |
Forrest France
|
|
|
Tim Phone #: ###-####
|
FIR-Aging Inspection | 8/10/2010 | 8/10/2010 | 8/10/2010 | | DONE |
Forrest France
|
|
|
Pending site inspection request by contractor.
|