INSP-Final Inspection | 9/22/2010 | 9/23/2010 | 9/23/2010 | A | PASS |
Forrest France
|
|
|
Final walkthrough passed after corrections made while on site. Permit finaled.
|
INSP-Supply line flush | 9/1/2010 | 9/2/2010 | 9/2/2010 | P | PART |
Forrest France
|
|
|
UG fire supply line flush completed satisfactory.
|
INSP-Sprinkler Rough-in | 9/1/2010 | 9/1/2010 | 9/1/2010 | P | PART |
Forrest France
|
|
|
Scheduled underground flush for the dedicated service supply line.
|
INSP-Sprinkler Rough-in | 6/4/2010 | 6/7/2010 | 6/7/2010 | A | PART |
Forrest France
|
|
|
Noted correction items field verified for completion, rough-in passed, okayed overhead cover. Contractor to be aware of possible light fixture obstructions that may occur due to type/proximity of appliances installed.
|
INSP-Sprinkler Rough-in | 6/2/2010 | 6/2/2010 | 6/2/2010 | P | FAIL |
Forrest France
|
|
|
Correction items include one obstructed head at room 205 first floor, sheetmetal impingement at a branchline in the hallway first floor, beam obstruction at the basement, overspaced head under the stairway to the basement, noted field modifications to be shown on plans including relocated branchlines and dry sw feeds. See plan annotations for locations marked today.
|