Information based on query as of Friday, July 5, 2024.
Permit Information
Permit NumberFIR10-00274
StatusFinaled
Name TRI STATE ELECTRIC
Site Address 4610 W HILLCREST DR
Project NameHILLCREST COUNTRY CLUB-PHASE 2
Customer Number 
ePlanReview 
Description
This fire alarm permit is to provide a new manual fire alarm system in an existing building and extend throughout phase 2. Included in this permit scope are; a pull station, full notification for phase 1 areas, kitchen hood suppression system monitoring, sprinkler system monitoring, and HVAC monitoring/shutdown.

Associated building permit: BLD09-00031 Hillcrest Country Club - Phase II Remodel - Demo and remodel interior of the east portion, east of grid line S "Social Building", of an existing golf course country club building. The work includes remodeling the existing women's locker room, maintenance and pool office areas into new restrooms, swimming pool shower and restrooms, maintenance shop, maintenance office, furniture storage area and pool office. To relocate and remodel existing bar and dining areas. Remodel and make restrooms fully accessible. No work is being done at the existing kitchen and employee restrooms. There is a two-hour, masonry fire wall constructed at grid line Q. The area of the Phase I project is 18,900 square feet with a 11,900 square foot basement. This building is fully fire sprinkled. The sprinklers are used for area increase. The area on the west side of the fire wall is 18,150 sq. ft. with an 11,900 sq. ft. basement; the area on the east side of the fire wall is 21,710 sq. ft. with a 1,535 sq. ft. basement. This permit is for Phase II of the project only. A separate tenant improvement permit was issued for to finish Phase I (BLD09-00980). All construction per the approved plans and attached comment list. JCM
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection2/28/20113/1/20113/1/2011APASS
DetailsTroy Cobbley
Permit finaled
INSP-Final Inspection2/25/20112/25/20112/25/2011PFAIL
DetailsTroy Cobbley
Provide as-builts and map for the facp with the correct device addressing.
INSP-Final Inspection2/23/20112/23/20112/23/2011PFAIL
DetailsTroy Cobbley
Todays inspection was for placement of notification devices and testing of the duct smoke detectors. See the city approved plans for locations where a/v's in the kitchen have been mounted too high. A weather proof a/v will be required in the Dish Washing room. The two abandoned manual pull stations in the Kitchen will need to be removed. EOL voltages will need to be verified especially since some of the strobes have been set at brighter setting than is required. Testing of the duct smoke detectors passed with minor modifications/repairs while I waited. Remote indicators will be required at all of the duct smoke detectors that have been installed on the same circuit. This includes the phase I devices. As-builts are required showing the new circuitry and a map provide for the FACP.
INSP-Final Inspection6/25/20106/28/20106/28/2010APASS
DetailsTroy Cobbley
Permit finaled. This is the phase I portion of the project.
INSP-Final Inspection6/24/20106/24/20106/24/2010ADEFR
DetailsForrest France
Contact: Rob Ahten - system has been tested, needs to be signed off Inspection requested from web by: Deb Gooden Phone #: ###-####