INSP-Final Inspection | 7/15/2010 | 7/15/2010 | 7/15/2010 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled. A supervisory point has been added.
|
INSP-Final Inspection | 7/6/2010 | 7/7/2010 | 7/7/2010 | P | FAIL |
Troy Cobbley
|
|
|
The netcon was a 5. The alarm and trouble signals tested ok. No supervisory signal was being separately transmitted but was instead transmitting out under the trouble contacts. Per Sean Stone, at SimplexGrinnell, this Autocall panel is capable of providing an individual supervisory signal with an additional relay. Since this panel is capable of this a separate supervisory signal is required.
|