Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberFIR10-00322
StatusFinaled
Name DEBEST FIRE PROTECTION
Site Address 7940 W RIFLEMAN ST Unit: 140
Project NameFidelity Investments
Customer Number 
ePlanReview 
Description
The Fire Sprinkler Scope of work consists of providing a new system for the east portion (east of column line F) of the building. The building was sprinklered with above protection in 11-06 as shell and core. The work under this permit is for the pendent sprinklers in the new ceiling. A new 3" wet riser is being cut into the existing 6" header. The existing header is supplied from 6" underground and 6" backflow preventer. All new sprinklers are to be quick response.

(Fidelity Investments) Permit for tenant improvements to an existing 4,150 sq. ft. tenant space with work to include two new accessible restrooms, construction of new interior non-bearing partition walls, Suspended ceiling, new vestibule, HVAC ducting, fire sprinkler, electrical and all related interior finishes. All work to be done per the approved plans, plan review report and any notations. This is a fully sprinklered building; any alterations to the existing sprinkler system will require a separate permit and shall comply with NFPA 13 as regulated by the City of Boise fire department. CDM
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection8/26/20108/26/20108/26/2010PPASS
DetailsTroy Cobbley
permit finaled
INSP-Final Inspection8/25/20108/25/20108/25/2010PCANC
DetailsTroy Cobbley
To be rescheduled for tomorrow when the fire alarm contractor is ready.
INSP-Sprinkler Rough-in/Hydro8/18/20108/18/20108/18/2010PPASS
DetailsTroy Cobbley
The overhead hydro test passed and the remaining sprinkler piping can be covered. One earthquake bracing was not installed but was installed by the end of the hydro test.
INSP-Sprinkler Rough-in8/16/20108/17/20108/17/2010APART
DetailsForrest France
Seismic bracing inspection passed- okay to replace insulation at the truss members.
INSP-Sprinkler Rough-in7/29/20107/30/20107/30/2010APASS
DetailsTroy Cobbley
The front lobby hardlid area piping is ok to cover. The earthquaking needs addressed. The earthquake detail were not legible. Clearer details need to be provided at the next inspection.