Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberFIR10-00346
StatusFinaled
Name ALLIED GENERAL FIRE & SECURITY
Site Address 5493 E WARM SPRINGS AVE
Project NameRiverstone International Schoo
Customer Number 
ePlanReview 
Description
8-17-11 PLAN MODIFICATION (13 initiating devices affected): This plan modification is to include the addition to the Arts and Sciences building (BLD11-00669 Riverstone International High School - Addition and Remodel - To construct a 1,010 square foot, one story, wood framed classroom addition on the northwest side of an existing 5,000 square foot school building; and to construct a 1,080 square foot roof covered walkway along the entire south side of the building. To remodel the existing building by constructing new interior partitions to divide existing Community Room into two new class rooms and an egress corridor to connect to the new egress corridor at the new addition. To demo and remove the interior partition between the existing office and reception/lobby area to increase the reception/lobby area. To add a new interior partition to divide the existing Faculty Room into two 100 square foot offices. To relocate the entry door to Classroom 119 and to add a new exterior egress door at the east exterior wall of Classroom 109. All construction per the approved plans and attached comment list. JCM), and implement the previous review comments and redlines. Full smoke detection is being provided in the Arts and Sciences building instead of duct detectors for HVAC shutdown/monitoring.

7-23-10:Lower Building (address 5521): This fire alarm permit is to replace the existing fire alarm panel with a new one that has networking capabilities to allow for future growth. This permit scope of work also includes the two modular buildings located to the south of the main school building. Devices included in this permit scope of work are a manual system, full notification, HVAC monitoring, and sprinkler system monitoring.
Arts & Science Building (address 5493) An existing Notifier slave panel is being removed from the Arts and Science Building no longer needed due to the FACP replacement in the Lower Building and its network capabilities. Devices included in this permit scope of work are a manual system, full notification, and HVAC monitoring. This building is not sprinklered.

Associated building permit: BLD09-01637 (RIVERSTONE INTERNATIONAL SCHOOL - Science Room) Permit is to remodel an existing Pre-K (Daycare) into a new science room. Approval per approved plans on file and plan review reports. Work to include: demolition of existing bathroom fixtures to convert restroom into storage, installation of 3 new sinks, relocation of existing chemical hood, relocating science lab tables (tables have hot/cold water, a waste line, and 4 electrical outlets), installation of chemical storage cabinets, and interior finishes in compliance with chapter 8 of the 2006 IBC. This building is not fire sprinklered. **TLW**

NOTE: Although the building permit is only for the Arts & Science building, per the contractor both buildings are to be under one fire alarm permit and attached to the same building permit noted above.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection10/3/201110/7/201110/7/2011APASS
DetailsForrest France
Corrections and adjustments made while on site. Network capabilities tested satisfactory, re-inspection items passed. Scope of fire alarm permit finaled.
INSP-Conference9/23/20119/23/20119/23/2011PDONE
DetailsForrest France
Regarding acceptance testing per NFPA 72 2007 ch 10.
INSP-Final Inspection8/18/20118/19/20118/19/2011AFAIL
DetailsForrest France
Began testing at the high school brick building address 5493 and modulars #1 and #2. Noted corrections include items on review notes # 7, 20, 25 and 13.
FIR-Aging Inspection3/21/20113/21/20113/21/2011 NR
DetailsForrest France
No call for inspection
FIR-Aging Inspection1/6/20111/6/20111/6/2011 DONE
DetailsForrest France
In progress
INSP-Conference10/18/201010/18/201010/18/2010ADONE
DetailsForrest France
On site meeting with Ray Criner, Engine 22, and property representative regarding status of permit work in progress.
INSP-Final Inspection9/20/20119/21/2011 P 
DetailsForrest France
Please cantact Jeremy at ###-####. This inspection is for a school and will need to be scheduled for 3pm or later so classes will not be disrupted. Thank you. Phone #: ###-#### >> Inspection requested via web by David Dilley