Permit Information
Permit NumberFIR10-00355
StatusFinaled
Name SHILO AUTOMATIC SPRINKLER CO
Site Address 950 W STATE ST
Project NameFirst Presbyterian Church TI
Customer Number 
ePlanReview 
Description
The Fire Sprinkler Scope of work consists of adding and revising the fire sprinkler protection to a portion of the building. When the fire sprinkler work is completed, the entire building will have fire sprinklers. The work will begin by adding a new backflow preventer and adding fire sprinklers to the eastern end of three levels. The basement fire protection is apparently existing. However, extensive changes are required to the fire sprinkler system. The existing underground piping is 4". The second floor piping will be tented with insulation to prevent freezing. The attic system will be a dry system. Each level will have a floor control valve per BMC. All sprinklers will be quick response type.

Plan Mod 1 Scope:

The plan mod scope of work consists of adding sprinklers to mechanical rooms located in the basement. In addition, the pipe sizes of the existing main in the basement were wrong and have been corrected. Therefore, new hydraulic calculations were needed and have been provided. Only the ballooned areas indicated as PM have been reviewed in this submittal.

________________________________________

Building Department Scope:

Fire sprinklers used for building area increase. To remodel the basement (3,528 square feet), first story (3,528 square feet), and second story (3,528 square feet) of the existing Lindsay Hall portion (East end of building) of the First Presbyterian Church. Work is to include upgrading the restrooms on all 3 stories to be accessible to the disabled, upgrading the enclosure of the East stairway to be 1-hr fire-resistance-rated, constructing interior walls, installing new folding partitions, and creating new openings in an existing masonry wall (steel headers and trimmers). Work also includes exterior windows, doors, suspended acoustical ceilings, interior finishes, and millwork. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes and ordinances. Lindsay Hall will be fully fire sprinklered throughout in conjunction with this permit. The fire sprinkler system of the entire First Presbyterian Church building is required to comply with NFPA 13 as regulated by the Fire Department. **CJW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection3/17/20113/18/20113/18/2011APASS
DetailsForrest France
C/N items completed. Inspection passed. Fire sprinkler permit finaled.
INSP-Final Inspection3/15/20113/17/20113/17/2011APART
DetailsForrest France
Verified dry system pressure switch and outside bell operations. Need to complete forward flow test per last inspection notes dated 2/14 and per plan review revision notes item #1 dated 8/11/10. Missing automatic air maintenance device per NFPA 13 7.2.6.5.1 or meet sec. 7.2.6.5.2.
INSP-Final Inspection3/14/20113/15/20113/15/2011ADEFR
DetailsForrest France
We will be there for the 7:30am final. Ken is the
contact. Thanks Phone #: ###-#### >> Inspection requested via web by Stan Beus
INSP-Final Inspection2/9/20112/14/20112/14/2011APART
DetailsForrest France
Final pending program change for the dry system pressure switch at the FACP and outside bell connection. Walkthrough passed, trip testing completed okay. Need to forward flow the DCVA.
INSP-Final Inspection2/2/20112/3/20112/3/2011ACANC
DetailsForrest France
Mike B is the contact. Thanks Phone #: ###-#### >> Inspection requested via web by Stan Beus Inspection cancelled from web by: Stan Beus
INSP-Final Inspection2/2/20112/4/20112/2/2011ACANC
DetailsForrest France
Mike B is the contact. We understand this is scheduled for 7:30 am. Thanks Phone #: ###-#### >> Inspection requested via web by Stan Beus Inspection cancelled from web by: Stan Beus
INSP-Final Inspection2/2/20112/3/20112/2/2011ACANC
DetailsForrest France
Mike B is the contact. We understand this is
scheduled for 7:30am Phone #: ###-#### >> Inspection requested via web by Stan Beus Inspection cancelled from web by: Stan Beus
INSP-Sprinkler Rough-in/Hydro1/31/20112/1/20112/1/2011PPART
DetailsForrest France
Concluded satisfactory 24 hr. pneumatic test of the dry system within allowable leakage per NFPA 13.
INSP-Sprinkler Rough-in1/28/20111/31/20111/31/2011PPART
DetailsForrest France
Begin 24 hr. air test of the new dry system 12:30 PM @45psig.
INSP-Final Inspection1/26/20111/28/20111/28/2011ANR
DetailsForrest France
Need to complete 24 hr. air test of the new dry system per NFPA 13 2007 24.2.2.1
INSP-Conference1/6/20111/6/20111/11/2011PDONE
DetailsForrest France
INSP-Sprinkler Rough-in/Hydro1/6/20111/7/20111/10/2011APART
DetailsForrest France
Overhead hydrostatic test for the new first floor system only, passed.
INSP-Sprinkler Rough-in12/16/201012/17/201012/17/2010PPART
DetailsForrest France
Correction items at the first floor per last inspection completed- okay to cover with the exception of the kitchen area grid ceilings incomplete at this time.
INSP-Sprinkler Rough-in12/6/201012/6/201012/6/2010PFAIL
DetailsForrest France
Rough-in inspection for the 1st floor completed- Noted exposed combustible construction lacking coverage at the open area south end, need to maintain 130 ft2 max spacing at the kitchen, field modifications in branchline routing at the east entry vestibule need to be installed per plan or proved by new calcs as five heads are now fed from a single 1" outlet. See redline areas on plan set for locations. Note: okay to cover remainder of installation.
INSP-Sprinkler Rough-in/Hydro11/4/201011/4/201011/4/2010APART
DetailsForrest France
Dry system hydro passed.
INSP-Sprinkler Rough-in/Hydro11/2/201011/3/201011/3/2010PPART
DetailsForrest France
Overhead hydrostatic test of the new dry system passed.
INSP-Sprinkler Rough-in10/19/201010/21/201010/22/2010APART
DetailsForrest France
Corrections at the second floor okayed for cover.
INSP-Sprinkler Rough-in10/18/201010/18/201010/18/2010PFAIL
DetailsForrest France
See inspection notes on stamped plan dated 9/17- provide coverage at two pockets, min. spacing at two pendent heads in the corrdior is exceeded.
INSP-Sprinkler Rough-in10/18/201010/18/201010/18/2010APART
DetailsForrest France
Okay to cover basement level overhead fire sprinkler install.
INSP-Sprinkler Rough-in10/15/201010/15/201010/15/2010PPART
DetailsForrest France
Re-inspection for relocated head in the basement okayed.
INSP-Sprinkler Rough-in10/7/201010/8/201010/8/2010APART
DetailsForrest France
See plans for locations red-lined with today's inspection notes.
INSP-Sprinkler Rough-in10/7/201010/8/201010/7/2010ACANC
DetailsForrest France
Nate is the contact. Thanks Phone #: ###-#### >> Inspection requested via web by Stan Beus Inspection cancelled from web by: Stan Beus
INSP-Sprinkler Rough-in/Hydro9/16/20109/17/20109/17/2010APART
DetailsTroy Cobbley
The rough-in for the basement was stopped after it was found that the 3" sch. 10 main as shown on the city approved plans was not installed. The 2nd floor dry and wet system rough-in inspection passed except as noted in red on the city approved plans and the piping can be covered. The overhead hydro on dry system failed due to a drop from 212 psi to 208 psi after two hours.
INSP-Sprinkler Rough-in/Hydro9/9/20109/10/20109/10/2010PPART
DetailsForrest France
Overhead hydrostatic test of the wet system riser adjacent to the dry valve passed.
INSP-Sprinkler Rough-in8/13/20108/16/20108/16/2010APART
DetailsForrest France
Overhead work at two restrooms basement level as initialed and annotated with today's date are okay for ceiling cover.