INSP-Final Inspection | 3/22/2011 | 3/24/2011 | 3/24/2011 | A | PASS |
Forrest France
|
|
|
Corrections finished. Fire alarm passed final inspection.
|
INSP-Final Inspection | 3/15/2011 | 3/17/2011 | 3/17/2011 | A | FAIL |
Forrest France
|
|
|
Speakers are not operational.
|
INSP-Final Inspection | 3/14/2011 | 3/15/2011 | 3/15/2011 | A | CANC |
Forrest France
|
|
|
7:30am if possible. Nick is the contact his no. is ###-####. Phone #: ###-#### >> Inspection requested via web by Shawna Gates Inspection cancelled from web by: Shawna Gates
|
INSP-Final Inspection | 2/9/2011 | 2/14/2011 | 2/14/2011 | A | FAIL |
Forrest France
|
|
|
C/N items include; pressure switch at the dry system must report as an alarm condition and initiate activation of the outside bell, adjust cd settings at the first floor vestibule and adjacent to the reception desk per plan, provide notification at the employee work room per plan review red line notes, mechanical room duct detector activates general alarm condition, provide a WP notification appliance at the 2nd floor shower room, replace 15cd strobe only per plan at the 2nd floor west corridor. KH monitor tested okay, remainder of fire sprinkler riser points also okayed.
|
INSP-Sprinkler Rough-in/Hydro | 2/9/2011 | 2/14/2011 | 2/9/2011 | A | CANC |
Forrest France
|
|
|
Please schedule for 7:30am. Rafe with Protex is the contact his cell no. is ###-####. Thank you.
Phone #: ###-#### >> Inspection requested via web by Shawna Gates Inspection cancelled from web by: Shawna Gates
|
INSP-Final Inspection | 1/27/2011 | 2/1/2011 | 1/31/2011 | A | NR |
Forrest France
|
|
|
|
INSP-Final Inspection | 1/27/2011 | 1/28/2011 | 1/27/2011 | A | CANC |
Forrest France
|
|
|
Request for 7:30am inspection. Rafe with Protex is the contat, his cell no. is ###-####. Phone #: ###-#### >> Inspection requested via web by Shawna Gates Inspection cancelled from web by: Shawna Gates
|
INSP-Alarm Testing | 11/15/2010 | 11/15/2010 | 11/16/2010 | P | PART |
Forrest France
|
|
|
Notification testing at the basement level previously completed- ref. building permit activity notes.
|