INSP-Final Inspection | 1/20/2011 | 1/20/2011 | 1/20/2011 | A | PASS |
Forrest France
|
|
|
Correction items verified for completion. Fire sprinkler permit finaled.
|
INSP-Final Inspection | 1/18/2011 | 1/19/2011 | 1/19/2011 | A | CANC |
Forrest France
|
|
|
I''m coming from Kuna please give me atleast a 30 minute heads up. Thx, Clarence Phone #: ###-#### >> Inspection requested via web by Clarence McLain Inspection cancelled from web by: John Venche
|
INSP-Sprinkler Rough-in/Hydro | 1/13/2011 | 1/14/2011 | 1/14/2011 | A | PART |
Troy Cobbley
|
|
|
Overhead hydrostatic test completed satisfactory per inspector 410.
|
INSP-Sprinkler Rough-in/Hydro | 1/12/2011 | 1/13/2011 | 1/13/2011 | P | PART |
Forrest France
|
|
|
Underground fire supply line hydrostatic test completed acceptable.
|
INSP-Final Inspection | 1/12/2011 | 1/13/2011 | 1/13/2011 | P | NR |
Forrest France
|
|
|
Missing field ceiling tile, escutcheons, DCVA certification, forward flow, etc.
|
INSP-Sprinkler Rough-in | 12/27/2010 | 12/28/2010 | 12/28/2010 | A | PART |
Forrest France
|
|
|
Overhead rough-in approved for cover at the office area grid ceilings. Need to provide coverage below the 6'x6' hood at the shop bay, include seismic clearance at main penetrations through non-frangible wall construction, install correct temp. rated heads within the zone of influence at unit heaters in the shop areas (SW and uprights).
|
INSP-Sprinkler Rough-in | 12/16/2010 | 12/17/2010 | 12/17/2010 | A | DEFR |
Forrest France
|
|
|
Inspection postponed due to jobsite condtions and access to city approved plan set on site.
|
INSP-Supply line flush | 12/1/2010 | 12/2/2010 | 12/6/2010 | P | PART |
Forrest France
|
|
|
Underground fire supply line flush completed acceptable.
|
INSP-Supply line flush | 11/30/2010 | 12/1/2010 | 12/1/2010 | P | CANC |
Forrest France
|
|
|
Phone #: ###-#### >> Inspection requested via web by John Venche Inspection cancelled from web by: John Venche
|
INSP-Sprinkler Rough-in/Hydro | 10/12/2010 | 10/13/2010 | 10/13/2010 | P | FAIL |
Forrest France
|
|
|
UG fire supply line hydrostatic test failed due to pressure loss below 200 psi at the guage.
|
INSP-Sprinkler Rough-in/Hydro | 10/13/2010 | 10/13/2010 | 10/13/2010 | A | PART |
Forrest France
|
|
|
Underground fire supply line is approved for bury. Need to provide method for seismic clearance at the floor slab. Discussed fire code review notes regarding PI valves and riser room ratings.
|