INSP-Final Inspection | 8/19/2011 | 8/19/2011 | 8/19/2011 | A | PASS |
Forrest France
|
|
|
UG fire supply line permit finaled.
|
INSP-Final Inspection | 8/15/2011 | 8/15/2011 | 8/15/2011 | P | PART |
Forrest France
|
|
|
UG permit okay for final when overhead is finaled.
|
INSP-Final Inspection | 6/15/2011 | 6/15/2011 | 6/15/2011 | P | PART |
Forrest France
|
|
|
Final pending overhead permit work.
|
FIR-Aging Inspection | 4/29/2011 | 4/29/2011 | 5/4/2011 | | PART |
Forrest France
|
|
|
Site work in progress
|
FIR-Aging Inspection | 2/22/2011 | 2/22/2011 | 2/23/2011 | | DONE |
Forrest France
|
|
|
Work in progress.
|
FIR-Aging Inspection | 12/23/2010 | 12/23/2010 | 12/28/2010 | | PART |
Forrest France
|
|
|
Site work in progress
|
INSP-Sprinkler Rough-in/Hydro | 10/22/2010 | 10/22/2010 | 10/22/2010 | P | PASS |
Troy Cobbley
|
|
|
The underground hydro test passed.
|
INSP-Sprinkler Rough-in/Hydro | 10/20/2010 | 10/20/2010 | 10/20/2010 | P | FAIL |
Forrest France
|
|
|
UG hydrostatic test failed due to pressure loss at the guage.
|
INSP-Sprinkler Rough-in | 10/5/2010 | 10/6/2010 | 10/8/2010 | P | PART |
Forrest France
|
|
|
Underground fire supply line okayed for bury. Contractor to provide seismic clearance at floor slab as discussed.
|