Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberFIR10-00509
StatusFinaled
Name SHILO AUTOMATIC SPRINKLER CO
Site Address 10681 W MCMILLAN RD
Project NameSpring Creek Boise Assisted
Customer Number 
ePlanReviewNo
Description
The Fire Sprinkler Scope of work consists of approximately 180’± of 6” C-900 underground pipe, fittings and thrust blocks to be installed per NFPA 24, IFC. Above ground fire protection system, is to follow under a separate permit.


Building Department Scope:

Addition and Remodel - The remodel is to convert one bedroom living unit #133 to a large studio unit and to enlarge dining room #116 by approximately 270 square feet. The additional square footage and occupant load at the dining room will change the occupancy group from a B Occupancy to an A-3 Occupancy. The addition portion of the project is to demolish and remove an existing porte cochere and construct a new is a 4,160 square foot, one story, wood framed, living unit wing edition on the southwest side of the existing assisted living building. The new addition will be connected to the existing building with an exit vestibule. The new addition will have six living units, four one-bedroom units and two large studio units. All construction per the approved plans and attached comment list. JCM –TF--


Fire Sprinkler System Design/Spacing:

Hydraulics were not reviewed at this time.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection2/1/20112/1/20112/1/2011PPASS
DetailsTroy Cobbley
Permit finaled
INSP-Final Inspection1/27/20111/28/20111/28/2011APASS
DetailsTim Frost
Additional sprinklers were installed to correct block sprinklers due to lighting.
INSP-Sprinkler Rough-in12/3/201012/3/201012/6/2010PCANC
DetailsTroy Cobbley
Was canceled due to time constraints.
INSP-Supply line flush11/19/201011/19/201011/19/2010PPASS
DetailsTroy Cobbley
The underground supply line flush passed.
INSP-Sprinkler Rough-in/Hydro11/19/201011/19/201011/19/2010PPASS
DetailsTroy Cobbley
The underground hydro test passed on the second attempt.
INSP-Sprinkler Rough-in11/19/201011/19/201011/19/2010PPASS
DetailsTroy Cobbley
The underground supply piping is ok to cover. On the first attempt to hydro the underground the pipe pushed apart. I waited while the piping was repaired and the hydro test was restarted.