Information based on query as of Tuesday, July 16, 2024.
Permit Information
Permit NumberFIR10-00510
StatusFinaled
Name TREASURE VALLEY FIRE PROTECTION
Site Address 8605 W FAIRVIEW AVE
Project NameDENNIS DILLION - CRICKET
Customer Number 
ePlanReviewNo
Description
The Fire Sprinkler Scope of work consists of extending a dry system to protect a new cricket area.


Building Department Scope:

To add onto and remodel two existing building to create a new 30,130 square foot, one story Nissan automobile dealership. The existing 10,365 square foot building, on the northwest corner will be remodeled into a showroom and sales area. The existing 4,860 square foot, premanufactured steel building on the southwest corner will be converted into a parts storage and sales area. A new 11,815 pre-engineered steel building addition will be constructed on the southeast side of the building for a service area and a 3,045 square foot, wood framed addition will be constructed to tie all of the building together. This area will contain a retail area, parts and service manager’s offices, tire storage, parts storage and part of the parts tech area. This permit also includes related site improvements. All construction per the approved plans and attached comment list. JCM –TF--
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection3/23/20113/24/20113/23/2011APASS
DetailsTroy Cobbley
Permit finaled
INSP-Sprinkler Rough-in3/10/20113/10/20113/10/2011PPASS
DetailsTroy Cobbley
Remaining sprinkler rough-in passed. Noted additional fittings affecting remote areas 2 and 3 but per Tim the hydraulic calculations are adequate. I also noted side wall heads under overhead doors that were not shown on the plans. One door at the east end of the service bay is going to be provided with an extended coverage sidewall that will need to be field approved. I also noted that the existing pendant sprinklers in the sales area are being blocked by suspended light fixtures. This problem will need to be addressed prior to final sign off. It appears that if the lights are mounted to the ceiling they will no longer be an obstruction.
INSP-Sprinkler Rough-in/Hydro3/10/20113/10/20113/10/2011PPART
DetailsForrest France
Dry system hydrostatic and pneumatic testing passed- see activity notes under project related FIR10-00579.
FIR-Aging Inspection1/25/20111/25/20112/2/2011 NR
DetailsTroy Cobbley
Wip
INSP-Sprinkler Rough-in11/12/201011/15/201011/16/2010APART
DetailsForrest France
New dry system piping at the cricket passed rough-in inspection. Two obstruction issues repaired while on site. See approved plan annotation for one area -the "entry element" not yet built including one dry pendent head and an upright not installed.