Permit NumberFIR10-00540
StatusFinaled
Name ABSOLUTE FIRE PROTECTION
Site Address 501 W FRONT ST
Project NameConcordia University Law Schoo
Customer Number 
ePlanReviewNo
Description
The Fire Sprinkler Scope of work consists of two wet systems to protect a new three-story addition and renovations to the existing two-story sprinkler system. A new 6” C-900 underground main will be connected to the existing 8” underground main to supply the systems. The underground is under permit FIR10-00473. A new 4” riser with 4” backflow preventer will supply the system through (floor) level control valves. The existing building sprinkler system was installed under FIR04-00616. The building(s) are to fully sprinklered throughout with quick response sprinklers.

Contractor’s Note:
The building permit has not been issued at this time. The building department may determine that changes are required to the building plans in order to meet code. These changes may affect the sprinkler system. The sprinkler contractor will be required to make all necessary changes that may be required. Therefore, if the sprinkler contractor chooses to proceed without an issued building permit they will do so on their own cognizance


Plan Mod 1
Includes, adding a deluge water curtain to door 120A of Hall 10 and along the wall to the librarian 133, adding a preaction system to the server room 232, miscellaneous as built changes including moving the main on the 2nd 3rd floor. Plan mod review is based on ballooned areas only.

Building Department Scope:

To construct a 32,565 square foot, three story addition on the west side of an existing 17,565 square foot two-story building. The interior of first floor of the existing building will be entirely demolished, with the exception of the existing accessible restrooms, shower room, mechanical, electrical and copy/fax rooms. The remaining portion of the existing first floor will be remodeled for 6 foot library book stacks, reading areas, small offices, study rooms and library circulation desk and work areas. The existing mezzanine will be expanded to create a 5,310 square foot second floor that will be used primarily for 6 foot book stacks. This second floor area will also contain a small reading area, small conference room, IT Tech area and three small shared study rooms. The first floor of the new addition will contain two large classrooms, a large waiting area, accessible restrooms, two small study rooms, and four storage areas for various types of storage. The second floor of the new addition will contain four classrooms of varying sizes, a student lounge, a faculty lounge, two accessible restrooms, a chapel, four small conference rooms, a mechanical room and four storage rooms. The third floor of the new addition contains primarily administrative and faculty offices, with one classroom, two large accessible restrooms and unisex accessible restroom. This floor also contains a mechanical room and janitor closet. The foundation was constructed under building permit BLD10-01393. All construction per the approved plans and attached comment list. JCM
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection8/25/20118/25/20118/25/2011PPASS
DetailsForrest France
C/N items field verified for completion. Fire sprinkler permit approved for final.
INSP-Final Inspection8/18/20118/19/20118/19/2011APART
DetailsForrest France
Items which remain for final include; ceilings at the bike and storage rooms- remove travel caps and install escutcheons on sw heads, remove thermal elements at the four deluge heads on the 1st floor, missing escutcheon at the 3rd floor, noted one closet at AV 222 missing coverage.
INSP-Final Inspection8/17/20118/18/20118/18/2011APART
DetailsForrest France
INSP-Final Inspection8/4/20118/9/20118/9/2011ANR
DetailsForrest France
INSP-Sprinkler Rough-in/Hydro7/28/20117/28/20117/28/2011APART
DetailsForrest France
Hydrostatic testing finished.
INSP-Sprinkler Rough-in/Hydro7/27/20117/27/20117/27/2011PPART
DetailsForrest France
OH hydrostatic testing finished for the 1st, 2nd, and 3rd floor systems including the deluge valve and standpipe.
INSP-Sprinkler Rough-in7/19/20117/20/20117/21/2011APART
DetailsForrest France
Remainder of overhead fire sprinkler work at the 3rd floor approved for cover with the exception of two pendent heads at corridor 328 obstructed by an adjacent soffit.
INSP-Sprinkler Rough-in/Hydro7/19/20117/20/20117/20/2011ACANC
DetailsForrest France
bryan Phone #: ###-####
INSP-Sprinkler Rough-in7/14/20117/15/20117/15/2011PPART
DetailsForrest France
Perimeter rooms at the third floor as marked on plans okayed for ceiling cover.
INSP-Sprinkler Rough-in/Hydro7/11/20117/11/20117/11/2011PPART
DetailsForrest France
INSP-Sprinkler Rough-in7/1/20117/5/20117/6/2011PPASS
DetailsTroy Cobbley
See the city approved plans for the second floor areas where the sprinkler piping can be covered. Earthquaking has been fixed.
INSP-Sprinkler Rough-in6/30/20117/1/20117/1/2011APASS
DetailsTroy Cobbley
See the city approved plans for the second floor areas that are ok to cover.
INSP-Sprinkler Rough-in6/9/20116/9/20116/9/2011PPASS
DetailsTroy Cobbley
See the city approved plans marked with todays date where piping is ok to cover. This included gridded areas on both sides of the south lobby.
INSP-Sprinkler Rough-in6/3/20116/3/20116/3/2011PPART
DetailsForrest France
Overhead fire sprinkler work at the first floor classrooms 114 and 107 and restrooms 111 and 112 are okay to cover at the drop ceilings. See clouded areas on plan set with today's date.
INSP-Sprinkler Rough-in5/5/20115/5/20115/6/2011PPART
DetailsForrest France
Preaction system piping at the second floor computer room approved for cover- see dated annotation on plans.
INSP-Sprinkler Rough-in/Hydro4/21/20114/21/20114/21/2011APART
DetailsForrest France
INSP-Sprinkler Rough-in4/19/20114/20/20114/20/2011APART
DetailsForrest France
See annotations on stamped plan set for areas on the 3rd floor okayed to cover with hard lid ceilings.
INSP-Sprinkler Rough-in4/8/20114/8/20114/8/2011PPART
DetailsForrest France
Overhead rough-in above hard lid ceilings as marked on plans with today's date for the first and second floors approved for cover.
INSP-Sprinkler Rough-in4/6/20114/7/20114/8/2011PPART
DetailsForrest France
Upright protection verified at the first floor link above the sheetrock ceiling.
INSP-Sprinkler Rough-in3/31/20114/1/20114/1/2011PPART
DetailsForrest France
See approved plan set for locations okayed for sheetrock ceiling cover at the 1st floor only- marked with today's date. Upright protection to be added at one area as marked.
INSP-Final Inspection3/9/20113/10/20113/10/2011APART
DetailsForrest France
Underground fire supply line flushing completed satisfactory.
INSP-Sprinkler Rough-in2/7/20112/8/20112/8/2011APART
DetailsForrest France
Inspection for beam clamp retainers and seismic brace attatchments at the third floor pre-fireproof coatings okayed.
INSP-Sprinkler Rough-in1/27/20111/27/20111/28/2011PPART
DetailsTim Frost
Inspected the hanger attachment in the area on the second floor which will be covered with fire proofing. The attachments passed inspection.
INSP-Sprinkler Rough-in1/11/20111/11/20111/11/2011PPART
DetailsForrest France
Inspection completed to verify retainer straps at beam clamps for the first floor 3" main hangers only.