INSP-Final Inspection | 12/2/2010 | 12/3/2010 | 12/3/2010 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Sprinkler Rough-in | 11/22/2010 | 11/22/2010 | 11/22/2010 | P | PART |
Troy Cobbley
|
|
|
Per conversation with EKC and the building inspector the sprinkler piping over the restrooms can be covered.
|
INSP-Sprinkler Rough-in | 11/19/2010 | 11/22/2010 | 11/22/2010 | A | FAIL |
Troy Cobbley
|
|
|
The insulation issue has not been addressed. Sprinkler piping can not be covered.
|
INSP-Sprinkler Rough-in | 11/17/2010 | 11/18/2010 | 11/18/2010 | A | FAIL |
Troy Cobbley
|
|
|
Resubmitt both plans due to: the floor plans don't match the actual wall layout, the site plan and addresses don't match, sprinkler heads used don't match whats installed. Also the insulation located at the deck is creating obstructions the the upright sprinkler heads. A 1" minimum clearance is required per NFPA 13.
|