Information based on query as of Tuesday, July 16, 2024.
Permit Information
Permit NumberFIR10-00658
StatusFinaled
Name MOUNTAIN ALARM
Site Address 10754 W EXECUTIVE DR
Project NameEXECUTIVE DRIVE BLDG #1
Customer Number 
ePlanReviewNo
Description
This fire alarm permit is to provide a new fire alarm panel and AES RF radio to replace an existing FACP/AES radio that has apparently been removed without authorization. The panel is for sprinkler system monitoring and includes a pull station and addressable modules for monitoring the sprinkler valves. No HVAC has been indicated on the plans. If duct detectors/HVAC shutdown is required/provided, a plan modification shall be required prior to calling for a final inspection.

Associated building permit: BLD10-02717 "Lennox" Permit for tenant improvements to an existing 10,000 sq. ft. tenant space with work to include the removal of all of the interior non-bearing partition walls with the exception of the bathroom walls, the construction of new interior partition walls, reconfiguration of the HVAC ducting, new lighting and suspended ceiling, drinking fountains, service sink and the construction of a new exterior concrete ramp with rails per the approved plans, plan review report and any notations. This is a fully sprinklered building; any alterations to the sprinkler system will require a separate permit and shall comply with NFPA 13 as regulated by the fire department. The conditions of this permit DO NOT include any approval for High Piled Storage. Any future High Piled storage shall be in accordance with IFC chapter 23; and permitted by the Boise Fire Department. *CDM/SJA*
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection1/20/20111/21/20111/21/2011APASS
DetailsTroy Cobbley
Permit finaled
INSP-Final Inspection1/11/20111/13/20111/13/2011AFAIL
DetailsTroy Cobbley
Provide building map as per note 19, provide knox box per note 20, adjust the backflow tamper switch and retest, provide the correct orfice in the inspectors test and test flow switch.
INSP-Conference1/11/20111/11/20111/12/2011PDONE
DetailsTroy Cobbley
I spoke to the on site electrical contractor, since the general contractor was not there, about the urgency of getting permanant power to the fire alarm panel that is being replaced. The electrical contractor stated that the work would be complete within 30 minutes. A final inspection of the project related fire alarm permit has been scheduled for thursday.