INSP-Final Inspection | 2/23/2011 | 2/23/2011 | 2/24/2011 | P | PASS |
Forrest France
|
|
|
Fire sprinkler permit finaled.
|
INSP-Final Inspection | 1/28/2011 | 1/28/2011 | 1/28/2011 | P | PASS |
Tim Frost
|
|
|
Sprinklers were changed to quick response per comment of previous inspection. Corrected minimum spacing issue per previous inspection
|
INSP-Final Inspection | 1/26/2011 | 1/26/2011 | 1/26/2011 | P | CANC |
Forrest France
|
|
|
don Phone #: ###-#### ///don called in and cancelled
|
INSP-Sprinkler Rough-in | 1/12/2011 | 1/12/2011 | 1/13/2011 | P | PART |
Forrest France
|
|
|
Noted three upright heads above the womens restroom ceiling and one ssu at the riser closet yet to be replaced with QR type per scope of work, two uprights at the basement level exceed min. spacing.
|
INSP-Sprinkler Rough-in/Hydro | 1/11/2011 | 1/12/2011 | 1/12/2011 | A | PART |
Forrest France
|
|
|
Overhead hydrostatic testing for the basement and first floor levels completed satisfactory.
|
INSP-Final Inspection | 1/11/2011 | 1/11/2011 | 1/11/2011 | P | PART |
Forrest France
|
|
|
Corrections per last notice at the RDG tenant space verified for completion.
|
INSP-Final Inspection | 1/7/2011 | 1/10/2011 | 1/10/2011 | A | PART |
Forrest France
|
|
|
Partial overhead rough-in completed- see plans for field annotations.
|
INSP-Sprinkler Rough-in | 1/7/2011 | 1/10/2011 | 1/10/2011 | A | PART |
Forrest France
|
|
|
Rough-in inspection for the RDG area as marked on plans with today's date okayed with exceptions including one head at the womens restroom janitor closet yet to be replaced with QR and upright heads at the open office to be in compliance with NFPA 13 8.3.1.3.
|