Permit Information
Permit NumberFIR11-00014
StatusFinaled
Name SIMPLEX GRINNELL
Site Address 1075 N CURTIS RD Unit: 200
Project NameNorthwest Pulmonary
Customer Number 
ePlanReviewNo
Description
2-16-11 PLAN MODIFICATION (no initiating devices affected): This plan modification is to change the scope to indicate heat pump shutdown rather than f/s damper shutdown as well as implement previous redlines and review comments.
1-24-11:This fire alarm permit is to provide a new NAC panel to accommodate new notification devices being added due to a tenant improvement. Full area coverage smoke detectors and auxiliary relays are being added to the existing system for f/s damper shutdown.

Associated building permit: BLD10-01875 (Northwest Pulmonary) **Modification to create a new doctor area, conference room and change the location of the reception area.** suite 200 Permit for tenant improvements to an existing 7,500 sq. ft. tenant space on the second story with work to include the removal of some interior non-bearing partition walls, ceiling grid, lighting, and misc. ducting and the installation of interior partition walls, suspended ceiling, lighting, ducting and related interior finishes. This building is fully sprinklered for one hour substitution; any alterations to the sprinkler system will require a separate permit and shall comply with NFPA 13 as regulated by The City of Boise Fire Department. All work to be done per the approved plans and all applicable codes. CDM
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection1/25/20121/27/20121/27/2012APASS
DetailsTroy Cobbley
Permit finaled. As-builts to be turned in.
INSP-Conference1/23/20121/23/20121/23/2012PDONE
DetailsTroy Cobbley
I met with Tamara and Charlie and discussed the project status. The projects will be followed up on and their status relayed to me.
INSP-Conference1/12/20121/12/20121/12/2012PDONE
DetailsTroy Cobbley
Colton had questions concerning the firemans hat light. I deferred the question to the fire alarm plan reviewer.
FIR-Aging Inspection1/12/20121/12/20121/12/2012 NR
DetailsTroy Cobbley
Still waiting for simplexgrinnell to correct the elevator recall functions.
INSP-Final Inspection7/5/20117/6/20117/6/2011AFAIL
DetailsTroy Cobbley
Permit can be finaled when the elevator recall functions have been corrected or an upgrade agreement with the Boise Fire Dept. has been reached.
INSP-Final Inspection7/1/20117/5/20117/5/2011AFAIL
DetailsTroy Cobbley
The horn located at the north stairwell door makes a continuous tone and not temporal. Per Colton this device should be on a new circuit.
INSP-Final Inspection7/1/20117/1/20117/1/2011PFAIL
DetailsTroy Cobbley
The strobe in room 225 failed to function and the elevator, as per previous discussions, needs to be addressed.
INSP-Sprinkler Rough-in5/19/20115/20/20115/20/2011ADONE
DetailsTroy Cobbley
The strobes in two additional exam rooms functioned correctly. Marked ok on the plans.
INSP-Sprinkler Rough-in4/28/20114/29/20114/29/2011APART
DetailsTroy Cobbley
Phase 3 and 5 are complete
INSP-Sprinkler Rough-in3/29/20113/29/20113/29/2011PCANC
DetailsTroy Cobbley
Wrong inspection type was called in. This was actually for alarm testing.
INSP-Alarm Testing3/29/20113/29/20113/29/2011PDONE
DetailsTroy Cobbley
The phase II fire alarm testing is complete. An item noted was any general smoke detector alarm would recall the elevator which is not allowed. I agreed to "sign off" for this phase II work but the elevator recall will need to be addressed prior to a final sign off on this project.
INSP-Alarm Testing2/16/20112/17/20112/17/2011ADONE
DetailsTroy Cobbley
See the city approved plans for devices marked ok that have been tested and passed. Research is needed to verify that the temporal signal "timing" meets NFPA 72.
INSP-Sprinkler Rough-in2/8/20112/9/20112/9/2011ACANC
DetailsTroy Cobbley
bryan Phone #: ###-####