INSP-Final Inspection | 2/9/2011 | 2/10/2011 | 2/10/2011 | A | PASS |
Forrest France
|
|
|
Recieved as-built plans from contractor regarding deleted head at the covered patio per NFPA 13 2007 8.15.7.3(1) exception. C/N items finished, permit finaled.
|
INSP-Final Inspection | 2/9/2011 | 2/10/2011 | 2/9/2011 | A | CANC |
Forrest France
|
|
|
jason Phone #: ###-#### Inspection cancelled from web by: Stan Beus
|
INSP-Final Inspection | 2/4/2011 | 2/7/2011 | 2/7/2011 | A | FAIL |
Forrest France
|
|
|
Missing escutcheons at the new office areas, covered head at one closet, patio at the north side is still missing a sidewall head- provide coverage per plan or document with a plan modification including reason deleted.
|
INSP-Sprinkler Rough-in/Hydro | 1/27/2011 | 1/27/2011 | 1/27/2011 | P | PASS |
Tim Frost
|
|
|
Hydro Passed.
Lower office area not previously inspected was ok to cover.
|
INSP-Sprinkler Rough-in | 1/21/2011 | 1/24/2011 | 1/24/2011 | A | PART |
Forrest France
|
|
|
Overhead okayed for cover at the east side addition sheetrock ceiling. Missing sw head per plan at the covered patio. Remainder of work scope incomplete at this time.
|