Permit Information
Permit NumberFIR11-00077
StatusFinaled
Name TREASURE VALLEY FIRE PROTECTION
Site Address 611 N STEELHEAD WAY
Project NameTrinity Health
Customer Number 
ePlanReviewNo
Description
The Fire Sprinkler Scope of work consists of adding, relocating and deleting sprinklers to accommodate new wall and ceiling configuration.


Building Department Scope:

(TRINITY HEALTH) The fire sprinkler system is used for building area increase. To create a 24,796 square foot office tenant space within an existing 33,000 square foot, 1 story building. Work is to include interior nonbearing walls, modified suspended ceilings, interior doors with sidelights, interior doors, and finishes. In addition, a new 5 foot opening will be created in an existing interior wood shear wall. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes and ordinances. The fire sprinkler system is required to comply with NFPA 13 as regulated by the Fire Department. A "vanilla finish" permit (BLD10-02988) for the adjacent tenant space is included on the same drawings. An interior nonstructural demolition permit (BLD10-02923) and a partial permit (BLD10-02987) have also been issued. **CJW**


Fire Sprinkler System Design/Spacing:

The existing system is 1½”x1½x1” compound grid with a 3” center rail.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection3/31/20114/1/20114/1/2011APASS
DetailsTroy Cobbley
permit finaled
INSP-Sprinkler Rough-in/Hydro3/21/20113/21/20113/21/2011PPASS
DetailsTroy Cobbley
The overhead hydro test passed. The remaining sprinkler piping can be covered.
INSP-Sprinkler Rough-in3/10/20113/11/20113/11/2011APASS
DetailsTroy Cobbley
The remainig sprinkler piping can be covered except as clouded in red on the drawings.
INSP-Sprinkler Rough-in3/8/20113/9/20113/9/2011APASS
DetailsTroy Cobbley
See the previous city approved plans, not the new plan modifications, for area where the sprinkler piping is ok to cover noted with todays date.
INSP-Conference3/3/20113/3/20113/3/2011PDONE
DetailsTroy Cobbley
I spoke to Lonnie about that it appears that there will be significant changes in the sprinkler plans that will require resubmittals/plan modifications.