INSP-Final Inspection | 6/16/2011 | 6/16/2011 | 6/16/2011 | P | PASS |
Forrest France
|
|
|
Fire sprinkler permit work passed final inspection.
|
INSP-Sprinkler Rough-in | 5/9/2011 | 5/9/2011 | 5/12/2011 | P | PART |
Forrest France
|
|
|
|
INSP-Sprinkler Rough-in | 4/6/2011 | 4/6/2011 | 4/7/2011 | P | PART |
Forrest France
|
|
|
Intermediate temp. heads/escutcheons at two locations verified 4/6.
|
INSP-Sprinkler Rough-in/Hydro | 3/23/2011 | 3/24/2011 | 3/24/2011 | A | PART |
Forrest France
|
|
|
Overhead fire sprinkler modifications at the new drop ceilings are okay for cover. Note: two intermediate temp concealed heads as marked on plans will need to be provided with 165 deg. escutcheons per submital.
|
INSP-Sprinkler Rough-in | 3/23/2011 | 3/23/2011 | 3/23/2011 | P | PART |
Forrest France
|
|
|
Rough to cover at new ceiling configuration.
|
INSP-Conference | 3/21/2011 | 3/21/2011 | 3/21/2011 | P | DONE |
Forrest France
|
|
|
Regarding spacing and coverage at cloud ceilings.
|