Permit Information
Permit NumberFIR11-00180
StatusFinaled
Name TREASURE VALLEY FIRE PROTECTION
Site Address 11311 W CHINDEN BLVD
Project NameHP BLDG # 7
Customer Number 
ePlanReviewNo
Description
The Fire Sprinkler Scope of work consists of converting a portion of a wet system into a double interlock preaction system to protect a new server and ups rooms. The existing main will be broken in two and capped. A new main will be routed to the new fire riser room to supply the new double interlock preaction valve. All high temperature sprinklers will be changed to ordinary temperature quick response type. Additional, pendent sprinklers will be added below the new ceiling. The detection system is electrical.


Building Department Scope:

To remodel a 5,439 sq. ft. area (3 rooms) within an existing office / storage / shipping building, for current and future I.T. infrastructure growth. Work to include: demolition work per plans; install a new raised access floor system, a new ceiling system with relocated lighting, a new hydraulic lift for equipment and ADA access; construct interior UL listed walls, doors and associated hardware per plans; install a new suspended soffit and acoustical ceiling grid systems; frame new interior walls suspended from roof structure; install new exterior concrete pads w/ mechanical units and exhaust systems that will serve the I.T. room; construct new exterior concrete stairs with metal handrails and guards; provide new exterior fascia and wall panel finishes; interior finishes in compliance with chapter 8 of the 2009 IBC; modify the existing fire alarm/sprinkler system to meet tenants needs and be in compliance with current adopted codes. Work per the approved plans, Engineering, and all other reviewing agencies approvals. NOTE: This building is fully sprinklered with 60 foot yards all around for unlimited area based on current occupancy use. A "Letter of Completion / Compliance" is required as a condition of occupancy for this tenant improvement. DRH10-00308 **SRZ**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection8/9/20118/9/20118/9/2011APASS
DetailsForrest France
Fire sprinkler permit passed final inspection.
INSP-Sprinkler Rough-in7/27/20117/27/20117/27/2011PPART
DetailsForrest France
Missing retainers added at end branch lines. Overhead okayed to cover.
INSP-Sprinkler Rough-in/Hydro7/19/20117/19/20117/19/2011PPART
DetailsForrest France
Pendent heads at the parts room, life test #2 and #1 inspected today. Noted missing retainers at four end of line hangers to be installed.
INSP-Sprinkler Rough-in/Hydro7/11/20117/11/20117/11/2011APART
DetailsForrest France
Overhead fire sprinkler work approved for cover at the drop ceilings.
INSP-Sprinkler Rough-in7/1/20117/6/20117/6/2011APART
DetailsForrest France
Overhead rough-in inspection completed acceptable.
INSP-Sprinkler Rough-in/Hydro6/27/20116/27/20116/28/2011PPART
DetailsForrest France
INSP-Sprinkler Rough-in/Hydro6/28/20116/28/20116/28/2011PPART
DetailsForrest France
Hydrostatic testing completed acceptable.