INSP-Final Inspection | 10/5/2011 | 10/5/2011 | 10/5/2011 | P | PASS |
Forrest France
|
|
|
Fire alarm permit finaled.
|
INSP-Alarm Testing | 10/4/2011 | 10/5/2011 | 10/5/2011 | A | PASS |
Forrest France
|
|
|
After hours reinspection passed, functional testing completed. C/N items and plan modifications verified.
|
INSP-Alarm Testing | 10/3/2011 | 10/3/2011 | 10/3/2011 | A | PART |
Forrest France
|
|
|
Ref. plans for areas inspected to date.
|
INSP-Alarm Testing | 9/29/2011 | 9/30/2011 | 9/30/2011 | A | PART |
Forrest France
|
|
|
As late as possible Phone #: 2089411846 >> Inspection requested via mobile web by Brian Anderson
|
INSP-Conference | 9/29/2011 | 9/29/2011 | 9/29/2011 | A | DONE |
Forrest France
|
|
|
Regarding plan modifications.
|
INSP-Conference | 8/2/2011 | 8/2/2011 | 8/2/2011 | A | DONE |
Forrest France
|
|
|
Regarding after hours inspection request 8/9 AM.
|
INSP-Final Inspection | 7/25/2011 | 7/25/2011 | 7/26/2011 | A | FAIL |
Forrest France
|
|
|
Correction items noted during after hours testing include; provide missing notification appliance in the package test chamber room, repair one corridor a/v adjacent to the NN room, relocated MP at one exit door is not finished due to pending work, two device address numbers are inconsistent with stamped plans, SD for door release have been deleted due to scope of work changes, one chamber and two notification devices at life test #2 have been moved. Provide plans reflecting actual scope of work completed including revised locations, addresses, circuts, etc.
|
INSP-Sprinkler Rough-in/Hydro | 7/8/2011 | 7/8/2011 | 7/8/2011 | P | PART |
Forrest France
|
|
|
Pre-inspection for work at life test #1 and the NN room completed.
|