Information based on query as of Friday, August 16, 2024.
Permit Information
Permit NumberFIR11-00194
StatusFinaled
Name TREASURE VALLEY FIRE PROTECTION
Site Address 190 E BANNOCK ST
Project NameSLRMC
Customer Number 
ePlanReviewNo
Description
The Fire Sprinkler Scope of work consists of adding, relocating and deleting sprinklers to accommodate new wall and ceiling configuration. The majority of the piping is existing. Most of the work is new arm overs. This area is in the SW corner of the first floor.


Building Department Scope:

(ST. LUKE'S 1S BI-PLANE SPECIALS LAB) Remodel of a 2,950 sq. ft. area on the first floor of an existing hospital building per approved plans. This space will expand into previous part of exit corridor to stair enclosure serving lower levels but will not affect required egress path for other areas of hospital on first floor or from lower levels. Work to include select demolition to allow expansion & remodel of 2,950 sq. ft. within existing BI-PLANE SPECIALS LAB on first floor. To construct interior non-bearing walls to create the BI-PLANE room, control room, read room, clean and soiled linen rooms, (3) private office's, waiting - reception - office and unisex accessible restroom; interior finishes, electrical, mechanical, plumbing, fire and alarm system modifications and a structural support platform on the roof for new HVAC unit and below the roof line to support the new overhead mounted equipment in BI-Plane room. NOTE: This building is fully fire sprinklered. Special Inspection is required as indicated on plans. Drs
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection11/8/201111/8/201111/8/2011PPASS
DetailsForrest France
Plan modifications verified. Final walkthrough and inspection passed. Fire sprinkler permit finaled.
INSP-Conference10/20/201110/20/201110/20/2011ADONE
DetailsForrest France
Regarding plan resubmittal for floorplan and branchline/main relocation.
INSP-Sprinkler Rough-in10/7/201110/7/201110/7/2011PPART
DetailsForrest France
Only clouded areas marked with today's date okayed for cover. Field install does not match plan at the bi-plane room, floorplan has changed, missing coverage at an electrical closet, one head adjacent to a soffit is blocked.
INSP-Sprinkler Rough-in10/6/201110/6/201110/7/2011PCANC
DetailsForrest France
Overbooked
INSP-Sprinkler Rough-in/Hydro8/15/20118/15/20118/15/2011PPART
DetailsForrest France
INSP-Sprinkler Rough-in6/14/20116/14/20116/14/2011PPART
DetailsForrest France
Okay to cover fire sprinkler system modifications at the manager, office and reception rooms. See dated and clouded areas on plans.