INSP-Final Inspection | 6/22/2015 | 6/22/2015 | 6/22/2015 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
FIR-Aging Inspection | 6/16/2015 | 6/16/2015 | 6/22/2015 | | PASS |
Troy Cobbley
|
|
|
|
FIR-Aging Inspection | 2/20/2013 | 2/20/2013 | 2/28/2013 | | DEFR |
Troy Cobbley
|
|
|
I contacted Roy in Fire Prevention and he is going to follow up with the owner.
|
INSP-Conference | 10/10/2012 | 10/10/2012 | 10/10/2012 | P | DONE |
Troy Cobbley
|
|
|
I met with Steve, with the BLM, and we verified that the solid shelving had been removed and that the storage had been reduce to 15'-0". A racking permit is still required. I defered him to plan review for further information on this permit due to his engineer stating that a permit should not be required. Sent email to Scott.
|
FIR-Aging Inspection | 10/5/2012 | 10/5/2012 | 10/10/2012 | | NR |
Troy Cobbley
|
|
|
See conference notes
|
FIR-Aging Inspection | 3/13/2012 | 3/13/2012 | 3/20/2012 | | NR |
Troy Cobbley
|
|
|
I spoke to Charlie with SimplexGrinnel and he stated he would follow up on this project.
|
INSP-Sprinkler Rough-in/Hydro | 5/24/2011 | 5/25/2011 | 5/25/2011 | P | PART |
Troy Cobbley
|
|
|
The overhead hydro and sprinkler rough-in passed. The plans are approved for max. storage height of 15'. The current storage height is 17' and solid shelving with 2x4 supports are being utilized. So the storage arrangement needs to be permanantly modified or resubmittals are required. Also the project can not be finaled until a racking permit is applied for.
|