Information based on query as of Tuesday, July 16, 2024.
Permit Information
Permit NumberFIR11-00228
StatusFinaled
Name SIMPLEX GRINNELL
Site Address 2603 W EASTOVER TER
Project NameBOISE TRAIN DEPOT FA REPLACE
Customer Number 
ePlanReviewNo
Description
This fire alarm permit is to replace the existing fire alarm system and devices with new. This permit scope of work includes a manual system with pull stations at every exit from every level, smoke detectors above the FACP and NAC panels, customer requested (performance based) automatic detection, notification throughout, beam detectors, elevator shaft fire/smoke damper control, duct detectors for HVAC shutdown/monitoring, sprinkler system monitoring, and remote annunciators. There is no associated building permit.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection2/20/20142/21/20142/21/2014APASS
DetailsForrest France
Remainder of fire alarm work and testing completed acceptable. Permit finaled.
FIR-Aging Inspection3/15/20133/15/20133/21/2013 DONE
DetailsForrest France
FIR-Aging Inspection8/28/20128/28/20128/28/2012 DEFR
DetailsForrest France
FIR-Aging Inspection4/27/20124/27/20124/27/2012 PART
DetailsForrest France
Okay to final when elevator recall functions are verified.
INSP-Final Inspection10/3/201110/3/201110/3/2011PCANC
DetailsTroy Cobbley
Overbooked.

Rod or Brian #: ###-####
INSP-Conference9/26/20119/26/20119/26/2011PDONE
DetailsForrest France
Regarding elevator recall functions.
INSP-Alarm Testing9/16/20119/22/20119/22/2011APART
DetailsForrest France
Items on previous inspection notes verified for completion. Permit final pending elevator recall functions.
INSP-Alarm Testing8/31/20119/6/20119/6/2011APART
DetailsForrest France
Noted correction items include; breaker lock at the panel, signage at doors to the FACP room, remove two non-functional existing SD, post points map at the panel, relocate two MP stations to no higher than 48" AFF, add visual coverage at the copy room 1st floor, provide letter regarding elevator. Items tested today include notification throughout, all HD and MP, panel conditons, sprinkler monitoring, duct detectors, and beam detectors. Settings at two notification appliances adjusted while on site.