Permit Information
Permit NumberFIR11-00263
StatusExpired
Name PEAK ALARM
Site Address 4600 S APPLE ST
Project NameMOTIVE POWER – FABRICATION PLA
Customer Number 
ePlanReviewNo
Description
This fire alarm permit is to provide an “owner requested” manual fire alarm system with performance based automatic detection in a non-sprinklered building. This permit scope includes a remote annunciator, a new NAC panel, pull stations at every exit, a smoke detectors, heat detectors, and full notification throughout the building. No HVAC monitoring/shutdown is indicated on the plans and therefore is not part of this scope of work. There is no associated building permit.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
FIR-Aging Inspection9/9/20149/9/20149/9/2014 PEND
DetailsForrest France
Refer to inspection notes 12/12/11 for correction items.
FIR-Aging Inspection3/21/20133/21/20133/21/2013 PEND
DetailsForrest France
FIR-Aging Inspection12/20/201212/20/201212/20/2012 PEND
DetailsForrest France
FIR-Aging Inspection9/20/20129/20/20129/20/2012 DONE
DetailsForrest France
wip
FIR-Aging Inspection6/21/20126/21/20126/21/2012 NR
DetailsForrest France
Pending correction items.
FIR-Aging Inspection3/22/20123/22/20123/22/2012 PEND
DetailsForrest France
Pending correction items dated 12/12/11.
INSP-Final Inspection12/12/201112/12/201112/12/2011PFAIL
DetailsTroy Cobbley
Provide strobe modifications as discussed to provide coverage in the deficient areas. All of the strobes in the shop areas are mounted too high. The need to meet NFPA 72 mounting heights, go with the performance based design (lighting calculations) or take it up with the fire marshal. As-builts need to be provided showing the strobe modifications and one additional pull station. This is to include revised one line and EOL calculations. Signals were sent out on phone line #1 but not phone line #2 so that needs to be tested as well. We discussed the phone lines as possibly be ground start and not loop start as required per NFPA 72 26.6.3.2.1.1. When the contractor calls my phone the same number comes up and he must dial "9" first.
INSP-Final Inspection12/6/201112/8/201112/12/2011ACANC
DetailsTroy Cobbley
Rescheduled for 12/12/2011