INSP-Final Inspection | 2/28/2012 | 2/28/2012 | 2/28/2012 | P | PASS |
Forrest France
|
|
|
Fire sprinkler permit finaled. Inspection passed.
|
INSP-Sprinkler Rough-in | 2/21/2012 | 2/21/2012 | 2/21/2012 | P | PASS |
Troy Cobbley
|
|
|
Two additional rooms are ok for cover. See the city approved plans.
|
INSP-Sprinkler Rough-in | 1/25/2012 | 1/25/2012 | 1/25/2012 | P | PASS |
Troy Cobbley
|
|
|
Piping in the lobby area can be covered.
|
INSP-Sprinkler Rough-in | 1/24/2012 | 1/24/2012 | 1/25/2012 | P | FAIL |
Troy Cobbley
|
|
|
Additional upright sprinkler coverage is required due to a full height wall.
|
INSP-Sprinkler Rough-in | 1/20/2012 | 1/20/2012 | 1/20/2012 | P | CANC |
Troy Cobbley
|
|
|
kevin Phone #: ###-#### Overbooked due to other inspections and Micron facilities plan review.
|
INSP-Sprinkler Rough-in | 12/9/2011 | 12/9/2011 | 12/9/2011 | P | PASS |
Troy Cobbley
|
|
|
Javier did not have the original copies of the approved plans. I let him know I will need them for the next inspection. I did however mark the copies he had the areas where sprinkler piping can be covered.
|
INSP-Sprinkler Rough-in | 8/22/2011 | 8/23/2011 | 8/23/2011 | A | PASS |
Troy Cobbley
|
|
|
See the city approved plans for locations where the sprinkler piping is ok to cover. Todays area was in the south east corner of the building. One head, as marked on the plans, needs to be relocated or another pendant added due to a soffit obstruction.
|