The Fire Sprinkler Scope of work consists of installing 188’ of C-900 6” underground piping with necessary thrust blocks, coating and retainers.

Contractor’s Note: The building permit has not been issued at this time. The building department may determine that changes are required to the building plans in order to meet code. These changes may affect the sprinkler system. The sprinkler contractor will be required to make all necessary changes that may be required. Therefore, if the sprinkler contractor chooses to proceed without an issued building permit they will do so on their own cognizance.


Building Department Scope:

D & A Glass - (FOUNDATION PERMIT) - This permit is issued to do site grading and drainage, to pour footings and foundation and do underground utilities for the future construction of the new D & A Glass Company two story bulding. Work under this permit shall not proceed beyond the pour of the foundation until final approval of plans and issuance of the full building permit. The building will be constructed under permit BLD11-00946. As owner or designated agent, I acknowledge that I am performing this work at my own risk without assurance that the permit for the entire building structure will be granted, and I agree to make any modifications to the early foundation work performed as may be required to comply with the City Codes and the final approved building plans and conditions. All per engineered plans on file.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection1/3/20121/4/20121/4/2012APASS
DetailsTroy Cobbley
permit finaled
INSP-Sprinkler Rough-in12/7/201112/8/201112/8/2011APASS
DetailsTroy Cobbley
The second floor office sprinkler piping is ok to cover.
INSP-Sprinkler Rough-in/Hydro11/30/201111/30/201111/30/2011PPASS
DetailsTroy Cobbley
Underground hydro test and flush passed.
INSP-Sprinkler Rough-in8/3/20118/4/20118/4/2011APASS
DetailsTroy Cobbley
The underground supply piping is ok to cover. The installation of the tie in to the United water tap does not match plan and the fire aprinkler contractor decided not to install the PIV but to install a wall PIV. This change is to be shown on the overhead pipng submittals.