Information based on query as of Saturday, June 29, 2024.
Permit Information
Permit NumberFIR11-00435
StatusFinaled
Name TRI STATE ELECTRIC
Site Address 9175 W BARNES DR
Project NameGSA-DEPT OF AGRICULTURE
Customer Number 
ePlanReviewNo
Description
This quick permit is to provide four new notification devices and connect them to an existing spare NAC on the existing fire alarm panel due to a tenant remodel. This permit is part of a multi-phase fire alarm remodel. Multiple fire alarm permits will be pulled in the future as each area is going to be re-occupied. NOTE: There will not necessarily be multiple building permits, therefore the contractor understands the building will not be finaled until all fire alarm permits associated with the building scope of work have been finaled. Approval is subject to field measurement of the EOL voltage drop. For appliances with an operating voltage range of 16V – 33V, the minimum acceptable voltage is 19.6V with the AC power off. Any measurement below this voltage will be considered insufficient to run the NACs at the end of useful battery life of 20.4V. UL 864, Standard for Control Units for Fire Signaling Systems.The installing contractor shall have available at final inspection a voltage meter and measure end of line voltages; witnessed by the field inspector. There are no written review comments. Associated building permit: BLD11-00937 (GSA-DEPT OF AGRICULTURE – South East & North East corners of the Blue Heron Building) Permit is to remodel an existing 44,664 square foot office building. This building is fully fire sprinklered for area increase. Approval contingent upon adhering to the approved plans on file and plan review report. Work to include: [installation / demolition of interior partition walls to create a warehouse (S-1) area and multiple office/open office (B) areas], installation of a new floor sink, installation / relocation of new lighting, installation of new doors / accessible hardware, and finishes in compliance with chapter 8 of the 2009 IBC. This building is fully Fire Sprinklered with an approved Fire Alarm system. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department.**TLW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection10/16/201210/17/201210/17/2012APASS
DetailsTroy Cobbley
Permit finaled
INSP-Final Inspection9/26/20129/27/20129/27/2012ACANC
DetailsTroy Cobbley
I spoke to Brian Giacomino about the plans needing to be resubmitted due to device change out and new NAC panel installation.
INSP-Final Inspection7/10/20127/10/20127/10/2012AFAIL
DetailsTroy Cobbley
Horns did not sync though it is better with the new changes. Horns shall sync per NFPA 72, 18.4.2.5 and per the Boise City Fire Dept.
INSP-Final Inspection6/27/20126/28/20126/28/2012AFAIL
DetailsTroy Cobbley
Per the acting fire marshal, Gordon Goldsmith, the horns and the strobes need to meet NFPA 72 requirements for syncronization prior to a final sign off for the fire alarm permits.
INSP-Conference4/13/20124/16/20124/16/2012ADONE
DetailsTroy Cobbley
Rob Ahten, kevin and I went over obstructions to the visual coverage. There are many cubicle walls that exceed 6' in height.
INSP-Final Inspection2/28/20122/28/20122/28/2012PPART
DetailsForrest France
Final pending corrections per 430 completed 8/29/11 regarding sync issues.
INSP-Sprinkler Rough-in12/8/201112/9/201112/9/2011ACANC
DetailsTroy Cobbley
Wrong permit called in for inspection. The fire sprinkler was intended.
INSP-Final Inspection8/29/20118/29/20118/29/2011PPART
DetailsTroy Cobbley
Fire alarm functioned correctly. The issue is visual and audio sync'ing between the remodeled section and the existing area. Per Rob this issue is being worked on. Permit can be finaled when this is fixed and verified.
INSP-Final Inspection8/26/20118/26/20118/26/2011PCANC
DetailsTroy Cobbley
Inspection is going to be performed when the second half of phase 1 is reviewed, issued and installed.
INSP-Final Inspection8/26/20118/29/20118/26/2011ACANC
DetailsTroy Cobbley
Contact: Rafe - inspection must be done at 7:30 before opening please Phone #: ###-#### >> Inspection requested via web by Deb Gooden Inspection cancelled from web by: Deb Gooden
INSP-Final Inspection8/25/20118/26/20118/26/2011ACANC
DetailsTroy Cobbley
Contact: Rafe Phone #: ###-#### >> Inspection requested via web by Deb Gooden Inspection cancelled from web by: Deb Gooden