INSP-Final Inspection | 3/26/2013 | 3/27/2013 | 3/27/2013 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Final Inspection | 3/19/2013 | 3/26/2013 | 3/26/2013 | A | CANC |
Troy Cobbley
|
|
|
As early as possible Phone #: 2089411846 >> Inspection requested via mobile web by Brian Anderson Inspection cancelled via mobile web on Tuesday, March 26, 2013.
|
INSP-Final Inspection | 3/12/2013 | 3/19/2013 | 3/19/2013 | A | CANC |
Troy Cobbley
|
|
|
To be rescheduled for spring break
|
FIR-Aging Inspection | 11/26/2012 | 11/26/2012 | 11/29/2012 | | NR |
Troy Cobbley
|
|
|
Charlie is going to try to schedule this for next week
|
FIR-Aging Inspection | 4/5/2012 | 4/5/2012 | 4/9/2012 | | DONE |
Troy Cobbley
|
|
|
Was notified by the fire alarm plan reviewer that she has been contacted by an engineer about design issues for the school.
|
INSP-Final Inspection | 10/14/2011 | 10/17/2011 | 10/17/2011 | P | FAIL |
Troy Cobbley
|
|
|
Todays inspection was to finish up functional testing of the initiating devices. Due to my time constraints and only one contractor/tech we only had time to finish the second floor. Still need to check the portable classroom devices.
|
INSP-Final Inspection | 10/13/2011 | 10/14/2011 | 10/14/2011 | P | FAIL |
Troy Cobbley
|
|
|
Today's inspection was a partial test of the new fire alarm panel interconnection with the existing system circuits. Existing initiating devices tested today included most of the first floor main school building smoke detectors and manual pull stations. All tested items functioned and reported to the FACP. The items remaining to be tested include the gym, 2nd floor of the main building, and the portables. During inspection of the notification functionality, it was identified that parts of the building were temporal code and conflicted with surrounding areas that are steady tone. Per the original discussions, the entire existing building was reported to be steady tone, and that is why the new area was allowed to be installed to match. The areas with temporal include the auditorium and mixed devices throughout the rest of the school. This issue has been deferred to the plan reviewer and Scott Arellano. There is a non-functioning horn/strobe on the second floor that needs to be repaired. In addition, the gymnasium strobes are not synchronized and are newer system sensor devices. It is unclear if a permit was pulled for that work. Stephanie Cobbley is going to verify when synchronization started being required in code. Simplex is to let her know when the gym devices were installed. And finally, as-builts are required showing actual circuit call-outs since they are different than the contractor originally thought.
|