The Fire Sprinkler Scope of work consists of providing protection for System 4 Clean Room Photo Bay and Clean Link Photo Bay. The Clean Room Photo Bay part of the system is a 4”x4”x2” grid with a 6” feed main. The Clean Link Photo Bay has above and below protection which is supplied by two long 2” branch lines.

Note: See permit FIR11-00301, FIR11-00365, FIR11-0431, FIR11-00448 for the review on other portions of this building

Note: The nonclean link running through and parallel with column line 4 has not been included in this review.


Building Department Scope:

Micron Building B50 - R&D Building - To construct a new 111,005 square foot, two story, with 71,855 square foot basement, concrete and steel semiconductor fabrication R & D facility and related site improvements. The first floor level is 89, 435 sq. ft. (60,100 sq. ft. finished and 29,325 sq. ft. unfinished). The second floor is a 21,570 sq. ft. mechanical space (16,170 sq. ft. used and 5,400 square feet future). The basement level (subfab.) has 43,295 sq. ft. finished and 28,560 unfinished. All construction per the approved plans and attached comment list. JCM
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection10/24/201210/24/201210/30/2012PPASS
DetailsForrest France
Corrections finished. Fire sprinkler permit finaled.
INSP-Final Inspection10/22/201210/22/201210/30/2012PPART
DetailsForrest France
Plan modifications and field install checked for equivalence.
INSP-Final Inspection10/17/201210/19/201210/30/2012APART
DetailsForrest France
Field verified corrections.
FIR-Aging Inspection7/3/20127/3/20127/3/2012 DONE
DetailsForrest France
INSP-Sprinkler Rough-in4/2/20124/3/20124/4/2012PPART
DetailsForrest France
Previous C/N items verified for completion. Finished walkthrough for coverage adjustments at the overhead AMH tracks and cubbies. Noted missing coverage at the SW corner of the north half photo bay. Plan modifications pending.
INSP-Sprinkler Rough-in/Hydro3/28/20123/29/20123/30/2012APART
DetailsForrest France
System 4 overhead hydrostatic test passed. Completed re-inspection for relocated and added pendent heads at the AMH track areas. Noted missing hangers on three new arm-overs >2'.
INSP-Sprinkler Rough-in/Hydro2/28/20123/1/20123/2/2012PPART
DetailsForrest France
Re-inspection for noted correction items at system 4 photo bay and link include: retainers at mains and branchlines secured; adjustments in pendent head locations at AMH track underway- overhead storage cubbies may also present obstruction issues when installed; seismic bracing completed; pendent heads at the link drop ceiling are matched with grid install to date. Plans will need revised to reflect field modifications at several areas.
INSP-Sprinkler Rough-in/Hydro1/12/20121/13/20121/13/2012PFAIL
DetailsForrest France
Rough-in inspection completed for system # 4 clean link and photo bay. Noted items include missing retainers at several beam clamps on branchlines, 4" and 6" mains, missing hanger at arm-over, pendent heads are blocked or obstructed at numerous locations due to proximity to AMH brackets, flex head whips are not yet installed at various areas in the clean link, missing seismic bracing at the 6" main, secure EQ brace at the 4" main, added 90s at branchlines in the photo bay are not included in the calcs.- branch line restraint at these locations shall be provided per NFPA 13 9.3.6.4.
INSP-Conference2/1/20122/3/2012 A 
DetailsForrest France
Phone #: ###-#### >> Inspection requested via web by Alicia Pauley