INSP-Final Inspection | 1/3/2012 | 1/4/2012 | 1/4/2012 | A | PASS |
Troy Cobbley
|
|
|
permit finaled
|
INSP-Sprinkler Rough-in/Hydro | 12/19/2011 | 12/20/2011 | 12/20/2011 | P | PASS |
Troy Cobbley
|
|
|
24 hour air test and forward flush passed. First floor office area piping can be covered.
|
INSP-Sprinkler Rough-in/Hydro | 12/19/2011 | 12/19/2011 | 12/19/2011 | P | PASS |
Troy Cobbley
|
|
|
Wet and dry system hydro tests passed. The 24 hour air test was started at 2:00 with 42psi on the guage.
|
INSP-Sprinkler Rough-in/Hydro | 12/15/2011 | 12/16/2011 | 12/16/2011 | A | PASS |
Troy Cobbley
|
|
|
The rough-in inspection for all piping except for the first floor office area is passed. Mike needs to fix two retaining straps and provide flexible coupling at the top of all of the riser nipples. as shown on the approved plans. The piping in the dock area can be covered.
|
INSP-Sprinkler Rough-in/Hydro | 12/15/2011 | 12/15/2011 | 12/15/2011 | P | CANC |
Troy Cobbley
|
|
|
canceled due to time constraints
|
INSP-Sprinkler Rough-in | 12/8/2011 | 12/8/2011 | 12/8/2011 | P | PASS |
Troy Cobbley
|
|
|
The second floor office sprinkler piping can be covered.
|
INSP-Sprinkler Rough-in | 11/14/2011 | 11/15/2011 | 11/15/2011 | A | PASS |
Troy Cobbley
|
|
|
First and second floor hard lid areas are ok to cover. I noted that the sprinkler protection provided over the main entry canopy has not been installed. Mike is going to have his office contact me on this.
|
INSP-Sprinkler Rough-in | 11/9/2011 | 11/9/2011 | 11/9/2011 | P | PASS |
Troy Cobbley
|
|
|
The piping above the mens and womens 2nd floor restrooms is ok to cover.
|