INSP-Final Inspection | 2/19/2012 | 2/21/2012 | 2/21/2012 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled. The ceiling tile in the adjoining space was being installed.
|
INSP-Sprinkler Rough-in/Hydro | 2/15/2012 | 2/15/2012 | 2/16/2012 | P | PART |
Forrest France
|
|
|
Overhead inspection for cover passed. SW head at the west side entry and additional pendent opposite the new demising wall can be verified at final.
|
INSP-Sprinkler Rough-in/Hydro | 2/6/2012 | 2/10/2012 | 2/9/2012 | P | CANC |
Forrest France
|
|
|
call 30 minutes prior to arival Phone #: ###-#### >> Inspection requested via web by Sam Ball Inspection cancelled from web by: Sam Ball
|