Description
The Fire Sprinkler Scope of work consists of connecting to the previously installed 8” underground supply in the SE corner and extend up into the riser room with 8” pipe. In the riser room, the piping shall reduce to 6” and supply 6” header. A 6” pipe will be routed back down to connect to the previously installed 6” buried FDC. A 6” riser and feed main will supply a 4” cross main with 1¼", 1” side fed branch lines to protect system 11 (Future Mechanical Space and top of Stairs). A new 4” riser from the header will supply System 6 protecting (Electrical Room and Emergency Equipment Room) The 4” feed main will supply 1” side fed branch lines.

Note: See permit FIR11-00301, FIR11-00365, FIR11-0431, FIR11-00448, FIR11-00524 for the review on other portions of this building


Building Department Scope:

Micron Building B50 - R&D Building - To construct a new 111,005 square foot, two story, with 71,855 square foot basement, concrete and steel semiconductor fabrication R & D facility and related site improvements. The first floor level is 89, 435 sq. ft. (60,100 sq. ft. finished and 29,325 sq. ft. unfinished). The second floor is a 21,570 sq. ft. mechanical space (16,170 sq. ft. used and 5,400 square feet future). The basement level (subfab.) has 43,295 sq. ft. finished and 28,560 unfinished. All construction per the approved plans and attached comment list. JCM
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection11/19/201211/19/201211/19/2012PPASS
DetailsForrest France
Field verified as-built drawings. Permit finaled.
INSP-Final Inspection10/22/201210/22/201210/30/2012PPEND
DetailsForrest France
Provide as-built plans for changes to system 11 including added heads below ductwork, added branchline, additional uprights in both stairways.
INSP-Final Inspection10/17/201210/19/201210/30/2012APART
DetailsForrest France
Final walkthrough completed acceptable for system 6 included in this permit.
INSP-Sprinkler Rough-in/Hydro7/19/20127/20/20127/23/2012APART
DetailsForrest France
Overhead hydrostatic test passed.
INSP-Sprinkler Rough-in/Hydro7/23/20127/23/20127/23/2012PPART
DetailsForrest France
Overhead rough-in inspection completed. Noted six additional heads below ductwork, one added head in each stairway, one extra branchline below a soffit.
INSP-Sprinkler Rough-in/Hydro7/2/20127/3/20127/5/2012PPART
DetailsForrest France
System 6 overhead hydrostatic test and rough-in inspection completed satisfactory.
FIR-Aging Inspection6/8/20126/8/20126/8/2012 PEND
DetailsForrest France
Construction underway.