INSP-Final Inspection | 10/16/2012 | 10/17/2012 | 10/17/2012 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
FIR-Aging Inspection | 9/26/2012 | 9/26/2012 | 9/26/2012 | | NR |
Troy Cobbley
|
|
|
Per general contractor the work to fix the sync'ing problem is still being worked on.
|
INSP-Final Inspection | 6/27/2012 | 6/28/2012 | 6/28/2012 | A | FAIL |
Troy Cobbley
|
|
|
Per the acting fire marshal, Gordon Goldsmith, the horns and the strobes need to meet NFPA 72 requirements for syncronization prior to a final sign off for the fire alarm permits.
|
INSP-Final Inspection | 6/27/2012 | 6/27/2012 | 6/27/2012 | P | FAIL |
Troy Cobbley
|
|
|
The strobes sync. but the horns do not. Per the contractor they did sync until the two additional devices were added today. The fire alarm contractor is going to investigate the cause and/or contact the fire marshal if this is a new device versus an old device issue. EOL was verified.
|
INSP-Final Inspection | 2/28/2012 | 2/28/2012 | 2/28/2012 | P | FAIL |
Forrest France
|
|
|
Plans do not match installation, number of devices or scope of work completed.
|