Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberFIR12-00094
StatusFinaled
Name TREASURE VALLEY FIRE PROTECTION
Site Address 401 S BROADWAY AVE
Project NameWhole Foods Market
Customer Number 
ePlanReviewNo
Description
The Fire Sprinkler Scope of work consists of 6” underground to a 4” backflow preventer with wall PIV and 4” feed main. The system is a 4”x3”x2” grid. There is mezzanine along the north side of the building. The mezzanine is protected by a side feed system with a 4” main and telescoping branch piping. The building is approximately 28’ high. However, the fire protection system is designed for ordinary hazard group II that limits the height of storage to 12’ per NFPA.

See FIR12-00020 for the underground permit

Contractor’s Note: The building permit for the tenant finish out has not been issued at this time. The building department may determine that changes are required to the building plans in order to meet code. The changes may affect the sprinkler system. The sprinkler contractor will be obligated to make all necessary changes that may be required. Therefore, if the sprinkler contractor chooses to proceed without an issued building permit, they will do so on their own cognizance. This note does not constitute an early start agreement.


Building Department Scope:

Whole Foods Market (Cold Shell and Site Work Permit) - To construct a new 35,600 square foot, on story with 6,000 square foot mezzanine grocery store and related site improvements. The site work will include the entire site including the Walgreens. This building is constructed of masonry exterior walls and steel frame construction. This is a shell permit only and separate tenant improvement permit will be required to finish this building for occupancy. This building is fully fire sprinklered. The sprinklers are used for area increase. All construction per the approved plans and attached comment list. JCM
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection11/1/201211/1/201211/1/2012PPASS
DetailsForrest France
Shell fire sprinkler permit finaled.
INSP-Final Inspection10/19/201210/22/201210/30/2012APART
DetailsForrest France
Scope of shell fire protection work completed.
INSP-Final Inspection10/15/201210/16/201210/17/2012PPART
DetailsForrest France
INSP-Sprinkler Rough-in9/13/20129/14/20129/14/2012APART
DetailsForrest France
Noted items include seismic clearance at the riser main to the second floor, elevator pit missing coverage, limited access to the south half of the building due to floor finishes underway.
INSP-Sprinkler Rough-in5/16/20125/16/20125/16/2012APART
DetailsForrest France
UG IBR only okayed for cover