Description |
The Fire Sprinkler Scope of work consists of providing protection for System 5 Clean Room Shell Space. The system is a 4”x4”x2” grid with a 6” feed main. The sprinkler are on flex heads. The protection is between column lines K-B 2-17 on the clean room level.
Note: See permit FIR11-00301, FIR11-00365, FIR11-0431, FIR11-00448, FIR11-00524, FIR11-00645, FIR11-00658, FIR11-00659, FIR11-00689 for the review on other portions of this building
Building Department Scope:
Micron Building B50 - R&D Building - To construct a new 111,005 square foot, two story, with 71,855 square foot basement, concrete and steel semiconductor fabrication R & D facility and related site improvements. The first floor level is 89, 435 sq. ft. (60,100 sq. ft. finished and 29,325 sq. ft. unfinished). The second floor is a 21,570 sq. ft. mechanical space (16,170 sq. ft. used and 5,400 square feet future). The basement level (subfab.) has 43,295 sq. ft. finished and 28,560 unfinished. All construction per the approved plans and attached comment list. JCM
|