INSP-Final Inspection | 10/24/2012 | 10/24/2012 | 10/30/2012 | P | PASS |
Forrest France
|
|
|
Coverage below chem trays and ductwork center east to be provided under a separate FIR permit. Per agreement with contractor this work to be completed prior to project related BLD final.
|
INSP-Final Inspection | 10/22/2012 | 10/22/2012 | 10/30/2012 | P | PART |
Forrest France
|
|
|
Upright sprinklers provided under north and south side round ducts, one leak at a swing joint repaired.
|
INSP-Final Inspection | 10/17/2012 | 10/19/2012 | 10/30/2012 | A | PART |
Forrest France
|
|
|
Pending coverage below ductwork obstructions.
|
FIR-Aging Inspection | 9/27/2012 | 9/27/2012 | 9/28/2012 | | PEND |
Forrest France
|
|
|
|
INSP-Final Inspection | 6/25/2012 | 6/26/2012 | 6/26/2012 | P | PART |
Forrest France
|
|
|
Overhead rough-in passed.
|
INSP-Sprinkler Rough-in/Hydro | 6/25/2012 | 6/26/2012 | 6/26/2012 | P | PART |
Forrest France
|
|
|
Overhead hydrostatic test completed.
|
INSP-Sprinkler Rough-in/Hydro | 6/14/2012 | 6/15/2012 | 6/15/2012 | P | NR |
Forrest France
|
|
|
Charles Phone #: ###-#### *rescheduled per contractor request
|
INSP-Sprinkler Rough-in/Hydro | 6/11/2012 | 6/12/2012 | 6/12/2012 | P | NR |
Forrest France
|
|
|
Hydrostatic test rescheduled per contractor request.
|