INSP-Final Inspection | 6/18/2015 | 6/19/2015 | 6/19/2015 | A | PASS |
Jim Page
|
|
|
Previuos noted items corrected, fire system inspection passed/complete
|
INSP-Alarm Testing | 6/17/2015 | 6/18/2015 | 6/18/2015 | A | FAIL |
Troy Cobbley
|
|
|
Todays inspection was for the new addition. Smoke detectors did not alarm at the panel, Panel did not receive trouble signal from new addition. Smoke detectors to be mounted atleast 3'-0" from ceiling fans. I stopped testing until issues have been resolved.
|
INSP-Final Inspection | 6/16/2015 | 6/17/2015 | 6/17/2015 | A | CANC |
Troy Cobbley
|
|
|
Jack Phone #: ###-####
|
FIR-Aging Inspection | 6/10/2015 | 6/10/2015 | 6/10/2015 | | NR |
Troy Cobbley
|
|
|
It appears that work is in progress based on footing inspections.
|
INSP-Final Inspection | 5/20/2013 | 5/20/2013 | 5/20/2013 | A | PART |
Troy Cobbley
|
|
|
Temporary occupancy approved by building official per approval of plan modifications. The applicant has requested a TCO due to the addition not being completed. The estimated completeion date of the addition is within 360 days or sooner per the applicant.
|
INSP-Final Inspection | 5/13/2013 | 5/14/2013 | 5/14/2013 | A | FAIL |
Troy Cobbley
|
|
|
All work has been completed, inspected and tested up to the existing south wall. The gym and related restrooms have not been costructed yet. Two smoke detectors were relocated as I waited. Will need as-builts showing the closets where additional smoke detectors had to be added.
|