INSP-Final Inspection | 6/27/2013 | 6/28/2013 | 6/28/2013 | A | PASS |
Troy Cobbley
|
|
|
underground flush & forward flowtest passed. Permit finaled
|
INSP-Sprinkler Rough-in | 6/12/2013 | 6/12/2013 | 6/12/2013 | P | PASS |
Troy Cobbley
|
|
|
Underground hydro test passed.
|
INSP-Sprinkler Rough-in/Hydro | 6/12/2013 | 6/12/2013 | 6/12/2013 | A | PASS |
Troy Cobbley
|
|
|
The remaining underground supply piping can be covered.
|
INSP-Final Inspection | 5/30/2013 | 6/4/2013 | 6/4/2013 | A | FAIL |
Troy Cobbley
|
|
|
Need to perform the forward flush and perform a depth, flush and hydro inspection on the underground supply as per discussion. Also need to verify the flow switch function/interconnection with the facp.
|
FIR-Aging Inspection | 2/7/2013 | 2/7/2013 | 2/13/2013 | | NR |
Troy Cobbley
|
|
|
Work is in progress
|
INSP-Sprinkler Rough-in/Hydro | 9/18/2012 | 9/18/2012 | 9/18/2012 | P | PASS |
Troy Cobbley
|
|
|
Overhead rough-in and hydro test passed. Contractor to provide hydraulic calculations showing the six additional 2" elbows.
|
INSP-Final Inspection | 9/17/2012 | 9/18/2012 | 9/18/2012 | A | CANC |
Troy Cobbley
|
|
|
Please call Jeff Stom with time frame. Phone #: ###-#### >> Inspection requested via web by Jeff Packham Inspection cancelled from web by: Jeff Packham
|