DOC - Permit Finaled | | | 8/22/2013 | | DONE |
|
|
|
|
INSP-Final Inspection | 11/12/2012 | 11/13/2012 | 11/13/2012 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled. Earthquake bracing has been installed. I noted two missing retaining straps that Scott with Phoenix is going to install.
|
INSP-Final Inspection | 11/6/2012 | 11/7/2012 | 11/8/2012 | P | FAIL |
Forrest France
|
|
|
Missing seismic braces per plan at the new 3" main 1st floor. Remainder of ceiling tile and escutcheons yet to be installed at the second floor.
|
INSP-Sprinkler Rough-in | 10/29/2012 | 10/30/2012 | 10/30/2012 | A | FAIL |
Forrest France
|
|
|
Extended coverage SW head at the stairway landing is blocked by a beam, need access to view new main piping and tie-ins above the existing ceiling 1st floor, installation must match plan or provide new calcs per review notes- noted additional 90's at every drop and one extra 2 1/2" 90 2nd floor.
|